Building pile foundation with high bearing platform
The invention discloses a building pile foundation with a high bearing platform. The building pile foundation with the high bearing platform comprises a supporting plate and upper connecting columns; a connecting plate is arranged at the upper end of the supporting plate; lower connecting columns are installed at the lower ends of the upper connecting columns; the upper connecting columns are slidably connected with the lower connecting columns; first locking bolts are arranged on the upper parts of two side walls of each lower connecting column; and the first locking bolts are rotationally connected with the lower connecting columns. By adjusting the height between the upper connecting columns and the lower connecting columns, after the height is determined, the first locking bolts are locked, operation of foundations with different depths is achieved, limitation is prevented, and use is not affected; and a fixed block is pressed downwards, a boat anchor moves downwards, a bottom plate is fixed, the stability of a device is improved, potential safety hazards are avoided, and the building risk is reduced.
本发明公开了建筑桩基领域的具有高承台的建筑桩基,包括支撑板和上连接柱,支撑板上端设置有连接板,上连接柱下端均安装有下连接柱,上连接柱均与下连接柱滑动连接,下连接柱两侧壁上部均设置有第一锁紧螺栓,第一锁紧螺栓均与下连接柱转动连接;通过调节上连接柱与下连接柱之间的高度,当高度确定好后,将第一锁紧螺栓进行锁紧,实现不同深度的地基进行作业,防止受到局限性,不影响使用;通过向下压动固定块,船锚向下运动,将底板进行固定,提高了装置的稳定性,避免造成安全隐患,降低建筑风险。
Building pile foundation with high bearing platform
The invention discloses a building pile foundation with a high bearing platform. The building pile foundation with the high bearing platform comprises a supporting plate and upper connecting columns; a connecting plate is arranged at the upper end of the supporting plate; lower connecting columns are installed at the lower ends of the upper connecting columns; the upper connecting columns are slidably connected with the lower connecting columns; first locking bolts are arranged on the upper parts of two side walls of each lower connecting column; and the first locking bolts are rotationally connected with the lower connecting columns. By adjusting the height between the upper connecting columns and the lower connecting columns, after the height is determined, the first locking bolts are locked, operation of foundations with different depths is achieved, limitation is prevented, and use is not affected; and a fixed block is pressed downwards, a boat anchor moves downwards, a bottom plate is fixed, the stability of a device is improved, potential safety hazards are avoided, and the building risk is reduced.
本发明公开了建筑桩基领域的具有高承台的建筑桩基,包括支撑板和上连接柱,支撑板上端设置有连接板,上连接柱下端均安装有下连接柱,上连接柱均与下连接柱滑动连接,下连接柱两侧壁上部均设置有第一锁紧螺栓,第一锁紧螺栓均与下连接柱转动连接;通过调节上连接柱与下连接柱之间的高度,当高度确定好后,将第一锁紧螺栓进行锁紧,实现不同深度的地基进行作业,防止受到局限性,不影响使用;通过向下压动固定块,船锚向下运动,将底板进行固定,提高了装置的稳定性,避免造成安全隐患,降低建筑风险。
Building pile foundation with high bearing platform
具有高承台的建筑桩基
LIU CHENCHAO (author) / CHEN WANLI (author) / LIU XIAOQUN (author)
2021-11-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Goaf pile foundation bearing capacity experiment platform
European Patent Office | 2023
|Slope bridge construction pile foundation bearing platform
European Patent Office | 2024
|Building pile foundation bearing capacity detection device
European Patent Office | 2023
|Bridge high-pile bearing platform, bridge pile foundation structure and construction method thereof
European Patent Office | 2020
|