A platform for research: civil engineering, architecture and urbanism
Installation and construction method of steel reinforced concrete column and steel beam connection joint area
The invention provides an installation and construction method of a steel reinforced concrete column and steel beam connecting joint area. The installation and construction method comprises the following steps that S1, deepening design is carried out; S2, processing and manufacturing are carried out; S3, entrance acceptance is carried out; S4, steel columns are installed; S5, reinforcing steel bars are bound; S6, formworks are installed; and S7, concrete pouring is carried out. A steel structure coaming is adopted to replace stirrups and formworks in the section steel concrete column connection joint area, and the construction quality of the section steel column and steel beam connection joint area is improved.
本发明提供一种型钢混凝土柱与钢梁连接节点区的安装施工方法,包括下述步骤:S1、深化设计;S2、加工制作;S3、进场验收;S4、钢柱安装;S5、钢筋绑扎;S6、模板安装;S7、混凝土浇筑。本发明采用钢结构围板代替型钢混凝土柱连接节点区箍筋及模板,提高了型钢柱与钢梁连接节点区的施工质量。
Installation and construction method of steel reinforced concrete column and steel beam connection joint area
The invention provides an installation and construction method of a steel reinforced concrete column and steel beam connecting joint area. The installation and construction method comprises the following steps that S1, deepening design is carried out; S2, processing and manufacturing are carried out; S3, entrance acceptance is carried out; S4, steel columns are installed; S5, reinforcing steel bars are bound; S6, formworks are installed; and S7, concrete pouring is carried out. A steel structure coaming is adopted to replace stirrups and formworks in the section steel concrete column connection joint area, and the construction quality of the section steel column and steel beam connection joint area is improved.
本发明提供一种型钢混凝土柱与钢梁连接节点区的安装施工方法,包括下述步骤:S1、深化设计;S2、加工制作;S3、进场验收;S4、钢柱安装;S5、钢筋绑扎;S6、模板安装;S7、混凝土浇筑。本发明采用钢结构围板代替型钢混凝土柱连接节点区箍筋及模板,提高了型钢柱与钢梁连接节点区的施工质量。
Installation and construction method of steel reinforced concrete column and steel beam connection joint area
一种型钢混凝土柱与钢梁连接节点区的安装施工方法
CUI JIN (author) / FU XIAODUO (author) / ZHANG BAOYUN (author) / GOU SHENGGUI (author) / QUAN YOUWEI (author)
2021-11-19
Patent
Electronic Resource
Chinese
Construction method of steel reinforced concrete column-concrete beam joint core area
European Patent Office | 2024
|Concrete-filled steel tube column-reinforced concrete beam joint connection method
European Patent Office | 2015
|European Patent Office | 2023
|Connection joint of steel reinforced concrete beam and concrete filled steel tubular column
European Patent Office | 2020
|Steel reinforced concrete column-beam joint concrete pouring construction method
European Patent Office | 2021
|