A platform for research: civil engineering, architecture and urbanism
Method for installing and constructing external wall dry-hanging stone
The invention discloses a method for installing and constructing external wall dry-hanging stone, and relates to the technical field of external wall dry-hanging. The method for installing and constructing the external wall dry-hanging stone comprises the following steps that S1, in the construction process of the external wall dry-hanging stone, after keels are installed, T-shaped connecting pieces are manufactured or purchased, and the T-shaped connecting pieces are installed on the keels through bolts. According to the method for installing and constructing the external wall dry-hanging stone, the safety and firmness of the dry-hanging stone can be effectively improved, the installation difficulty of the dry-hanging stone is reduced, material loss is reduced, it is guaranteed that the installation quality of the external wall dry-hanging stone meets the requirement, therefore, the safety and the finished product impression of the dry-hanging stone are guaranteed, and the method is simple, practical, convenient to construct and capable of saving working hours, reducing construction cost, improving safety performance and guaranteeing the attractive effect of finished products.
本发明公开了一种外墙干挂石材安装施工方法,涉及外墙干挂技术领域。该外墙干挂石材安装施工方法,包括如下步骤:S1、在外墙干挂石材的施工过程中,在龙骨安装完成之后,制作或购买“T”形连接片,用螺栓安装于龙骨上。该外墙干挂石材安装施工方法,能有效的增加干挂石材的安全牢固以及降低干挂石材安装难度和减少材料损耗等问题,确保外墙干挂石材安装的质量达到要求,从而保证干挂石材的安全及成品观感。不仅简单实用,施工方便,还能节约工时,降低施工成本,增加安全性能,保证成品美观效果。
Method for installing and constructing external wall dry-hanging stone
The invention discloses a method for installing and constructing external wall dry-hanging stone, and relates to the technical field of external wall dry-hanging. The method for installing and constructing the external wall dry-hanging stone comprises the following steps that S1, in the construction process of the external wall dry-hanging stone, after keels are installed, T-shaped connecting pieces are manufactured or purchased, and the T-shaped connecting pieces are installed on the keels through bolts. According to the method for installing and constructing the external wall dry-hanging stone, the safety and firmness of the dry-hanging stone can be effectively improved, the installation difficulty of the dry-hanging stone is reduced, material loss is reduced, it is guaranteed that the installation quality of the external wall dry-hanging stone meets the requirement, therefore, the safety and the finished product impression of the dry-hanging stone are guaranteed, and the method is simple, practical, convenient to construct and capable of saving working hours, reducing construction cost, improving safety performance and guaranteeing the attractive effect of finished products.
本发明公开了一种外墙干挂石材安装施工方法,涉及外墙干挂技术领域。该外墙干挂石材安装施工方法,包括如下步骤:S1、在外墙干挂石材的施工过程中,在龙骨安装完成之后,制作或购买“T”形连接片,用螺栓安装于龙骨上。该外墙干挂石材安装施工方法,能有效的增加干挂石材的安全牢固以及降低干挂石材安装难度和减少材料损耗等问题,确保外墙干挂石材安装的质量达到要求,从而保证干挂石材的安全及成品观感。不仅简单实用,施工方便,还能节约工时,降低施工成本,增加安全性能,保证成品美观效果。
Method for installing and constructing external wall dry-hanging stone
一种外墙干挂石材安装施工方法
GU ZHEN (author) / LIU BAOTANG (author)
2021-11-19
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Method for installing oversized logo on dry hanging stone curtain wall
European Patent Office | 2024
|Method for precisely installing R-shaped dry hanging stone plate hanging element
European Patent Office | 2015
|Hanging wall board structure and installing method thereof
European Patent Office | 2015
|