A platform for research: civil engineering, architecture and urbanism
Rectangular concrete-filled steel tube cable bent tower adopting assembly type prefabricated webs
A rectangular concrete-filled steel tube cable bent tower adopting assembly type prefabricated webs is used for effectively improving the construction efficiency, the construction quality and the construction safety of the cable bent tower and greatly saving the construction period and the construction cost. A tower column is composed of concrete filled steel tube sections which are longitudinally connected into a whole, each concrete filled steel tube section comprises a tower column steel tube and a web plate, the tower column steel tubes filled with concrete are longitudinally and transversely arranged at intervals, the adjacent tower column steel tubes are welded and connected with a flat-connection web member to form a lattice structure, and the web plates are arranged between the adjacent tower column steel tubes and fixedly connected with the adjacent tower column steel tubes. The tower column steel pipe is a rectangular steel pipe, the web is a prefabricated reinforced concrete web component, and the prefabricated reinforced concrete web component and the tower column steel pipe are assembled and connected into a whole through a connecting component and a pulling rivet.
一种采用装配式预制腹板的矩形钢管混凝土索塔,以有效提高索塔施工效率、施工质量和施工安全性,大幅度节省施工工期和建造费用。其塔柱由纵向连接为一体的钢管混凝土节段构成,各钢管混凝土节段包括塔柱钢管和腹板,其内灌注混凝土的塔柱钢管纵向、横向间隔设置,相邻塔柱钢管焊接连接平联腹杆形成格构结构,腹板设置于相邻塔柱钢管之间且与之固定连接。所述塔柱钢管为矩形钢管,所述腹板为预制钢筋混凝土腹板构件,预制钢筋混凝土腹板构件与塔柱钢管之间通过连接构件和拉铆钉装配连接为一体。
Rectangular concrete-filled steel tube cable bent tower adopting assembly type prefabricated webs
A rectangular concrete-filled steel tube cable bent tower adopting assembly type prefabricated webs is used for effectively improving the construction efficiency, the construction quality and the construction safety of the cable bent tower and greatly saving the construction period and the construction cost. A tower column is composed of concrete filled steel tube sections which are longitudinally connected into a whole, each concrete filled steel tube section comprises a tower column steel tube and a web plate, the tower column steel tubes filled with concrete are longitudinally and transversely arranged at intervals, the adjacent tower column steel tubes are welded and connected with a flat-connection web member to form a lattice structure, and the web plates are arranged between the adjacent tower column steel tubes and fixedly connected with the adjacent tower column steel tubes. The tower column steel pipe is a rectangular steel pipe, the web is a prefabricated reinforced concrete web component, and the prefabricated reinforced concrete web component and the tower column steel pipe are assembled and connected into a whole through a connecting component and a pulling rivet.
一种采用装配式预制腹板的矩形钢管混凝土索塔,以有效提高索塔施工效率、施工质量和施工安全性,大幅度节省施工工期和建造费用。其塔柱由纵向连接为一体的钢管混凝土节段构成,各钢管混凝土节段包括塔柱钢管和腹板,其内灌注混凝土的塔柱钢管纵向、横向间隔设置,相邻塔柱钢管焊接连接平联腹杆形成格构结构,腹板设置于相邻塔柱钢管之间且与之固定连接。所述塔柱钢管为矩形钢管,所述腹板为预制钢筋混凝土腹板构件,预制钢筋混凝土腹板构件与塔柱钢管之间通过连接构件和拉铆钉装配连接为一体。
Rectangular concrete-filled steel tube cable bent tower adopting assembly type prefabricated webs
一种采用装配式预制腹板的矩形钢管混凝土索塔
2021-11-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Concrete-filled steel tube composite cable bent tower and construction method thereof
European Patent Office | 2021
|Prefabricated assembled rectangular concrete filled steel tube pole
European Patent Office | 2021
|European Patent Office | 2021
|