A platform for research: civil engineering, architecture and urbanism
The invention provides a building formwork quick release system and a multi-layer reuse formwork closing method, and relates to the technical field of building engineering. The building formwork quick release system comprises a concrete standard mold, a concrete corner mold, a standard connecting piece, a corner connecting piece and a steering connecting piece. According to a formwork system in the prior art, a formwork can be dismantled after 15-20 days, and three layers of formwork battens are arranged. According to the formwork system, only three to four days are needed, a primary keel, a secondary keel and a main top plate formwork can be dismantled under the condition that a top plate supporting system is not moved when top plate concrete is plasticized to 50%, and only one layer of formwork batten is arranged. The building formwork quick release system and the multi-layer reuse formwork closing method is suitable for buildings such as basement non-standard commercial middle and high-rise building projects, schools and hospitals, villas and the like.
本发明提供一种建筑模板快拆体系及多层复用关模方法,涉及建筑工程技术领域,包括混泥土标准模具和混泥土转角模具,以及标准连接件、转角连接件和转向连接件。现有技术的模板体系需要等待15‑20天才能够拆除模板,而且配三层模板木方。本实施例的模板体系只需要三至四天,在顶板混凝土塑化到50%的安全时候时就可以在顶板支撑体系不动的情况下,可以拆除主次龙骨和主要的顶板模板,而且只配一层模板木方。适合于地下室非标商业中高层建筑项目,学校医院,别墅等建筑。
The invention provides a building formwork quick release system and a multi-layer reuse formwork closing method, and relates to the technical field of building engineering. The building formwork quick release system comprises a concrete standard mold, a concrete corner mold, a standard connecting piece, a corner connecting piece and a steering connecting piece. According to a formwork system in the prior art, a formwork can be dismantled after 15-20 days, and three layers of formwork battens are arranged. According to the formwork system, only three to four days are needed, a primary keel, a secondary keel and a main top plate formwork can be dismantled under the condition that a top plate supporting system is not moved when top plate concrete is plasticized to 50%, and only one layer of formwork batten is arranged. The building formwork quick release system and the multi-layer reuse formwork closing method is suitable for buildings such as basement non-standard commercial middle and high-rise building projects, schools and hospitals, villas and the like.
本发明提供一种建筑模板快拆体系及多层复用关模方法,涉及建筑工程技术领域,包括混泥土标准模具和混泥土转角模具,以及标准连接件、转角连接件和转向连接件。现有技术的模板体系需要等待15‑20天才能够拆除模板,而且配三层模板木方。本实施例的模板体系只需要三至四天,在顶板混凝土塑化到50%的安全时候时就可以在顶板支撑体系不动的情况下,可以拆除主次龙骨和主要的顶板模板,而且只配一层模板木方。适合于地下室非标商业中高层建筑项目,学校医院,别墅等建筑。
Building formwork quick release system and multi-layer reuse formwork closing method
一种建筑模板快拆体系及多层复用关模方法
XU LIANG (author)
2021-11-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Supporting angle formwork supporting system and formwork quick-release construction method
European Patent Office | 2024
|