A platform for research: civil engineering, architecture and urbanism
Aeolian sand filler filling method for desert abdominal expressway
The invention relates to the technical field of highway construction, and discloses an aeolian sand filler filling method for a desert abdominal expressway. The aeolian sand filler filling method for a desert abdominal expressway comprises the following steps: S1, on-site investigation and sampling; S2, filling method testing; and S3, filling method determination. According to the construction method, a stable and durable roadbed can be constructed under the condition that soil taking and water consumption are reduced to the maximum extent according to engineering characteristics, and the construction concept of ecological roads and environment-friendly roads is met while the engineering cost is reduced. Comprehensive test comparison is carried out on engineering characteristics, compaction characteristics and different filling methods of the aeolian sand roadbed filler of the desert abdominal expressway, and a most suitable filling method can be quickly determined when the desert abdominal expressway is constructed, so that preparatory work before construction is reduced, and the problem of insufficient stability of the expressway caused by an improper filling method can be avoided.
本发明涉及公路建设技术领域,且公开了一种沙漠腹地高速公路风积沙填料填筑方法;本沙漠腹地高速公路风积沙填料填筑方法包括以下步驟:S1:现场考察采样;S2:填筑方法试验;S3:填筑方法确定,本发明能够根据工程特性在最大程度减少取土和用水的条件下构筑成稳固耐用的路基,在降低工程造价的同时,符合“生态路、环保路”的建设理念,通过对沙漠腹地高速公路风积沙路基填料的工程特性、压实特性和不同的填筑方法进行了综合试验对比,能够快速确定在对沙漠腹地进行高速公路建设时最适合的填筑方法,以此减少了建设前的准备工作,且可避免因使用不当的填筑方法造成的高速公路稳定性不足的问题。
Aeolian sand filler filling method for desert abdominal expressway
The invention relates to the technical field of highway construction, and discloses an aeolian sand filler filling method for a desert abdominal expressway. The aeolian sand filler filling method for a desert abdominal expressway comprises the following steps: S1, on-site investigation and sampling; S2, filling method testing; and S3, filling method determination. According to the construction method, a stable and durable roadbed can be constructed under the condition that soil taking and water consumption are reduced to the maximum extent according to engineering characteristics, and the construction concept of ecological roads and environment-friendly roads is met while the engineering cost is reduced. Comprehensive test comparison is carried out on engineering characteristics, compaction characteristics and different filling methods of the aeolian sand roadbed filler of the desert abdominal expressway, and a most suitable filling method can be quickly determined when the desert abdominal expressway is constructed, so that preparatory work before construction is reduced, and the problem of insufficient stability of the expressway caused by an improper filling method can be avoided.
本发明涉及公路建设技术领域,且公开了一种沙漠腹地高速公路风积沙填料填筑方法;本沙漠腹地高速公路风积沙填料填筑方法包括以下步驟:S1:现场考察采样;S2:填筑方法试验;S3:填筑方法确定,本发明能够根据工程特性在最大程度减少取土和用水的条件下构筑成稳固耐用的路基,在降低工程造价的同时,符合“生态路、环保路”的建设理念,通过对沙漠腹地高速公路风积沙路基填料的工程特性、压实特性和不同的填筑方法进行了综合试验对比,能够快速确定在对沙漠腹地进行高速公路建设时最适合的填筑方法,以此减少了建设前的准备工作,且可避免因使用不当的填筑方法造成的高速公路稳定性不足的问题。
Aeolian sand filler filling method for desert abdominal expressway
一种沙漠腹地高速公路风积沙填料填筑方法
YIN WENHUA (author)
2021-11-30
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Method for compacting aeolian sand roadbed of expressway in desert area
European Patent Office | 2021
|Method for highly filling embankment with aeolian sand in desert area
European Patent Office | 2023
|Aeolian sand filling material for mine filling and preparation method thereof
European Patent Office | 2022
|