Open-air archaeological tomb excavation simulation display construction process and simulation tomb
The invention discloses an open-air archaeological tomb excavation simulation display construction process and a simulation tomb, and relates to the field of archaeological site simulation display. The construction process comprises the following steps of S1, determining the position of a simulation tomb and the position of a drainage pipe; S2, digging a tomb out, and burning a drainage pipe; S3, arranging a reinforcing mesh; S4, erecting a formwork on the inner side of the side wall of the tomb; S5, pouring base layer concrete between the bottom of the tomb and the formwork and between the side walls of the tomb and the formwork to form a concrete base layer; S6, constructing a simulation surface layer, specifically, constructing the simulation surface layer on the concrete base layer, and burning a natural crack simulating formwork in the simulation surface layer at the bottom of the tomb in the construction process; and S7, instilling a corrosive agent on the natural crack imitating template, dissolving the natural crack imitating template, and forming a natural drainage imitating crack communicating with the water inlet end of the drainage pipe. The simulated tomb is manufactured by adopting the process. The construction process has the effect of conveniently simulating the tomb for open-air display.
本申请公开一种露天考古墓葬发掘模拟展示施工工艺及模拟墓坑,涉及考古遗址模拟展示的领域,施工工艺包括步骤一、确定的模拟墓葬位置和排水管位置;步骤二、清挖出墓坑,并埋设排水管;步骤三、布设钢筋网片;步骤四、在墓坑侧壁内侧支设模板;步骤五、在墓坑底部以及墓坑侧壁和模板之间浇筑基层混凝土,形成混凝土基层;步骤六、仿真面层施工:在混凝土基层上施做仿真面层,施做过程中在墓坑底部的仿真面层中埋设仿自然裂缝模板;步骤七、将腐蚀剂滴注在仿自然裂缝模板上,溶化仿自然裂缝模板,形成与排水管进水端连通的仿自然排水裂缝。模拟墓坑采用上述工艺制成。本申请具有便于模拟墓葬进行露天展示的效果。
Open-air archaeological tomb excavation simulation display construction process and simulation tomb
The invention discloses an open-air archaeological tomb excavation simulation display construction process and a simulation tomb, and relates to the field of archaeological site simulation display. The construction process comprises the following steps of S1, determining the position of a simulation tomb and the position of a drainage pipe; S2, digging a tomb out, and burning a drainage pipe; S3, arranging a reinforcing mesh; S4, erecting a formwork on the inner side of the side wall of the tomb; S5, pouring base layer concrete between the bottom of the tomb and the formwork and between the side walls of the tomb and the formwork to form a concrete base layer; S6, constructing a simulation surface layer, specifically, constructing the simulation surface layer on the concrete base layer, and burning a natural crack simulating formwork in the simulation surface layer at the bottom of the tomb in the construction process; and S7, instilling a corrosive agent on the natural crack imitating template, dissolving the natural crack imitating template, and forming a natural drainage imitating crack communicating with the water inlet end of the drainage pipe. The simulated tomb is manufactured by adopting the process. The construction process has the effect of conveniently simulating the tomb for open-air display.
本申请公开一种露天考古墓葬发掘模拟展示施工工艺及模拟墓坑,涉及考古遗址模拟展示的领域,施工工艺包括步骤一、确定的模拟墓葬位置和排水管位置;步骤二、清挖出墓坑,并埋设排水管;步骤三、布设钢筋网片;步骤四、在墓坑侧壁内侧支设模板;步骤五、在墓坑底部以及墓坑侧壁和模板之间浇筑基层混凝土,形成混凝土基层;步骤六、仿真面层施工:在混凝土基层上施做仿真面层,施做过程中在墓坑底部的仿真面层中埋设仿自然裂缝模板;步骤七、将腐蚀剂滴注在仿自然裂缝模板上,溶化仿自然裂缝模板,形成与排水管进水端连通的仿自然排水裂缝。模拟墓坑采用上述工艺制成。本申请具有便于模拟墓葬进行露天展示的效果。
Open-air archaeological tomb excavation simulation display construction process and simulation tomb
露天考古墓葬发掘模拟展示施工工艺及模拟墓坑