Continuous beam side span cast-in-place section pier top supporting system
The invention relates to the technical field of building construction. The continuous beam side span cast-in-place section pier top supporting system comprises an extension frame and supporting steel connecting the extension frame and a pier top, the extension frame is arranged at the front end of a main truss, and the rear section of a hanging basket is supported by a track through a Nth block; and the front end of the hanging basket is supported by a bracket structure consisting of the extension frame and the supporting steel, so that the system not only can improve the working efficiency and reduce the working cost when the side pier is higher, but also effectively solves the dangerous problems that the hanging basket is limited by the length of the Nth block, cannot be moved too much, otherwise is easy to fall off and the like, meanwhile, due to the horizontal arrangement mode of the extension frame and the vertical arrangement mode of the supporting steel, the whole system is more stable and firmer.
本公开涉及建筑施工技术领域,该连续梁边跨现浇段墩顶支撑系统包括延伸架和连接所述延伸架和墩顶的支撑钢,所述延伸架设置在主桁架的前端,挂篮的后段通过N号块与轨道支撑,并且前端通过所述延伸架和所述支撑钢组成的支架结构支撑,该系统不仅能够在边墩较高时,提高了工作效率,减少了工作成本,而且有效的解决了挂篮受到N号块长度的制约,无法迁移过多,否则容易掉落等危险的问题,同时延伸架的水平设置方式和支撑钢竖直设置方式,使整个系统更加稳定,更加牢靠。
Continuous beam side span cast-in-place section pier top supporting system
The invention relates to the technical field of building construction. The continuous beam side span cast-in-place section pier top supporting system comprises an extension frame and supporting steel connecting the extension frame and a pier top, the extension frame is arranged at the front end of a main truss, and the rear section of a hanging basket is supported by a track through a Nth block; and the front end of the hanging basket is supported by a bracket structure consisting of the extension frame and the supporting steel, so that the system not only can improve the working efficiency and reduce the working cost when the side pier is higher, but also effectively solves the dangerous problems that the hanging basket is limited by the length of the Nth block, cannot be moved too much, otherwise is easy to fall off and the like, meanwhile, due to the horizontal arrangement mode of the extension frame and the vertical arrangement mode of the supporting steel, the whole system is more stable and firmer.
本公开涉及建筑施工技术领域,该连续梁边跨现浇段墩顶支撑系统包括延伸架和连接所述延伸架和墩顶的支撑钢,所述延伸架设置在主桁架的前端,挂篮的后段通过N号块与轨道支撑,并且前端通过所述延伸架和所述支撑钢组成的支架结构支撑,该系统不仅能够在边墩较高时,提高了工作效率,减少了工作成本,而且有效的解决了挂篮受到N号块长度的制约,无法迁移过多,否则容易掉落等危险的问题,同时延伸架的水平设置方式和支撑钢竖直设置方式,使整个系统更加稳定,更加牢靠。
Continuous beam side span cast-in-place section pier top supporting system
连续梁边跨现浇段墩顶支撑系统
ZHAO LICAI (author)
2021-12-03
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Continuous rigid frame side span cast-in-place section formwork supporting system
European Patent Office | 2023
|Continuous beam side pier beam section bracket balance cast-in-place construction method
European Patent Office | 2020
|Cast-in-place construction method for side span connection pier
European Patent Office | 2022
|Large-span side-span cast-in-place section construction method
European Patent Office | 2024
|Complex large-span cast-in-place capping beam pier column consolidation method
European Patent Office | 2024
|