Installation and construction method for steel beams on shear wall
The invention discloses an installation construction method of steel beams on a shear wall. The installation construction method comprises the following steps of completing the construction of the shear wall, and forming a plurality of installation holes in the shear wall; erecting a plurality of supporting jig frames in the enclosure range of the shear wall; hoisting first steel beams machined in a segmented mode and installing the first steel beams on the shear wall, wherein the two ends of each first steel beam are inserted into the two installation holes respectively and fixedly connected with the shear wall, and the middle of each first steel beam is supported at the top end of the corresponding supporting jig frame; hoisting second steel beams machined in a segmented mode and installing the second steel beams on the shear wall, wherein the two ends of each second steel beam are inserted into the two installation holes respectively, and the middle of each second steel beam is fixedly connected with the corresponding first steel beam; hoisting third steel beams machined in a segmented mode and installing the third steel beams on the shear wall; and hoisting fourth steel beams machined in a segmented mode and installing the fourth steel beams on the shear wall. According to the installation construction method of the steel beams on the shear wall, cross operation can be effectively reduced, and the construction workload is reduced.
本发明公开了一种剪力墙上钢梁的安装施工方法,包括以下步骤:完成剪力墙的施工,并在剪力墙上设置多个安装孔;在剪力墙的围合范围内架设若干个支撑胎架;将分段加工的第一钢梁吊起,并安装在剪力墙上,其中,各第一钢梁的两端分别插设在两个安装孔中,且各第一钢梁的两端与剪力墙固定连接,各第一钢梁的中部支撑于支撑胎架的顶端;将分段加工的第二钢梁吊起,并安装在剪力墙上,其中,各第二钢梁的两端分别插设在两个安装孔中,各第二钢梁的中部与第一钢梁固定连接;将分段加工的第三钢梁吊起,并安装在剪力墙上;将分段加工的第四钢梁吊起,并安装在剪力墙上。本发明的剪力墙上钢梁的安装施工方法能够有效减少交叉作业,减少施工工作量。
Installation and construction method for steel beams on shear wall
The invention discloses an installation construction method of steel beams on a shear wall. The installation construction method comprises the following steps of completing the construction of the shear wall, and forming a plurality of installation holes in the shear wall; erecting a plurality of supporting jig frames in the enclosure range of the shear wall; hoisting first steel beams machined in a segmented mode and installing the first steel beams on the shear wall, wherein the two ends of each first steel beam are inserted into the two installation holes respectively and fixedly connected with the shear wall, and the middle of each first steel beam is supported at the top end of the corresponding supporting jig frame; hoisting second steel beams machined in a segmented mode and installing the second steel beams on the shear wall, wherein the two ends of each second steel beam are inserted into the two installation holes respectively, and the middle of each second steel beam is fixedly connected with the corresponding first steel beam; hoisting third steel beams machined in a segmented mode and installing the third steel beams on the shear wall; and hoisting fourth steel beams machined in a segmented mode and installing the fourth steel beams on the shear wall. According to the installation construction method of the steel beams on the shear wall, cross operation can be effectively reduced, and the construction workload is reduced.
本发明公开了一种剪力墙上钢梁的安装施工方法,包括以下步骤:完成剪力墙的施工,并在剪力墙上设置多个安装孔;在剪力墙的围合范围内架设若干个支撑胎架;将分段加工的第一钢梁吊起,并安装在剪力墙上,其中,各第一钢梁的两端分别插设在两个安装孔中,且各第一钢梁的两端与剪力墙固定连接,各第一钢梁的中部支撑于支撑胎架的顶端;将分段加工的第二钢梁吊起,并安装在剪力墙上,其中,各第二钢梁的两端分别插设在两个安装孔中,各第二钢梁的中部与第一钢梁固定连接;将分段加工的第三钢梁吊起,并安装在剪力墙上;将分段加工的第四钢梁吊起,并安装在剪力墙上。本发明的剪力墙上钢梁的安装施工方法能够有效减少交叉作业,减少施工工作量。
Installation and construction method for steel beams on shear wall
剪力墙上钢梁的安装施工方法
CHEN XU (author) / HE ZHAOFEI (author) / MA ZHAOWEN (author) / JIANG WEI (author) / GENG YIJIE (author) / SHEN YINPING (author) / YUE HAILONG (author)
2021-12-03
Patent
Electronic Resource
Chinese
External shear wall steel pipe formwork integral hoisting installation construction method
European Patent Office | 2021
|Shear wall horizontal rib installation positioning rod and construction method
European Patent Office | 2020
|Installation construction method for steel structure wall panel
European Patent Office | 2022
|Installation device and method for shear wall shaping steel mould
European Patent Office | 2021
|