A platform for research: civil engineering, architecture and urbanism
Illumination engineering civil construction foundation pit excavation equipment
The invention discloses illumination engineering civil construction foundation pit excavation equipment. The equipment comprises a carrying carriage, wherein moving wheels are installed at the four corners of the bottom of the carrying carriage; a dragging hook is connected to the left side wall of the carrying carriage; the right end of the carrying carriage is open; sliding strips are symmetrically connected to the inner wall of the carrying carriage in the front-back direction; a positioning table is arranged in an inner cavity of the carrying carriage; sliding ways matched with the sliding strips are formed in the front end and the rear end of the positioning table; a supporting shaft is rotationally connected to the top of the positioning table; a cylindrical base is connected to the top of the supporting shaft; a concentric-square-shaped frame is arranged above the cylindrical base; an excavation table is arranged at the right side of the concentric-square-shaped frame; and a PLC is connected to the outer wall of the carrying carriage. The equipment is reasonable in structural design, the working stability of the equipment can be improved, the foundation pit excavation accuracy can be improved conveniently, and follow-up installation of a street lamp pole is facilitated.
本发明公布了一种照明工程土木施工基坑开挖设备,包括运载车厢,运载车厢的底部四角安装有移动轮,运载车厢的左侧壁连接有拖载挂钩,运载车厢的右端开口设置,运载车厢的内壁前后对称连接有滑条,运载车厢的内腔设有定位台,定位台的前后两端开设有与滑条相配合的滑道,定位台的顶部转动连接有支撑轴,支撑轴的顶部连接有圆柱座,圆柱座的上方设有回型框,回型框的右侧设有开挖台,运载车厢的外壁连接有PLC控制器;本发明结构设计合理,有利于提高装置工作的稳定性,便于提高基坑开挖的精确度,便于进行路灯杆的后续安装。
Illumination engineering civil construction foundation pit excavation equipment
The invention discloses illumination engineering civil construction foundation pit excavation equipment. The equipment comprises a carrying carriage, wherein moving wheels are installed at the four corners of the bottom of the carrying carriage; a dragging hook is connected to the left side wall of the carrying carriage; the right end of the carrying carriage is open; sliding strips are symmetrically connected to the inner wall of the carrying carriage in the front-back direction; a positioning table is arranged in an inner cavity of the carrying carriage; sliding ways matched with the sliding strips are formed in the front end and the rear end of the positioning table; a supporting shaft is rotationally connected to the top of the positioning table; a cylindrical base is connected to the top of the supporting shaft; a concentric-square-shaped frame is arranged above the cylindrical base; an excavation table is arranged at the right side of the concentric-square-shaped frame; and a PLC is connected to the outer wall of the carrying carriage. The equipment is reasonable in structural design, the working stability of the equipment can be improved, the foundation pit excavation accuracy can be improved conveniently, and follow-up installation of a street lamp pole is facilitated.
本发明公布了一种照明工程土木施工基坑开挖设备,包括运载车厢,运载车厢的底部四角安装有移动轮,运载车厢的左侧壁连接有拖载挂钩,运载车厢的右端开口设置,运载车厢的内壁前后对称连接有滑条,运载车厢的内腔设有定位台,定位台的前后两端开设有与滑条相配合的滑道,定位台的顶部转动连接有支撑轴,支撑轴的顶部连接有圆柱座,圆柱座的上方设有回型框,回型框的右侧设有开挖台,运载车厢的外壁连接有PLC控制器;本发明结构设计合理,有利于提高装置工作的稳定性,便于提高基坑开挖的精确度,便于进行路灯杆的后续安装。
Illumination engineering civil construction foundation pit excavation equipment
一种照明工程土木施工基坑开挖设备
DONG XIAOMA (author) / CHEN LIFEI (author)
2021-12-07
Patent
Electronic Resource
Chinese
Groove excavation equipment for civil engineering construction
European Patent Office | 2023
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2024
|