A platform for research: civil engineering, architecture and urbanism
Gypsum board decorative wall construction process
The invention relates to a gypsum board decorative wall construction process, and relates to the field of interior decoration. The gypsum board decorative wall construction process comprises the following steps that S1, according to a design construction drawing, a partition wall position line and a top keel position line are set on a made ground or a ground sleeper belt; S2, a top keel and a ground keel are sequentially installed; S3, according to the design requirements, positioning assemblies are arranged between the top keel and the ground keel at proper intervals, vertical keels are installed based on the positioning assemblies, and the positioning assemblies are used for reducing abrasion between the vertical keels and the top keel and between the vertical keels and the ground keel; S4, according to the design requirements, transverse clamping keels are arranged, and the clamping keels and the vertical keels are clamped through clamping assemblies; and S5, sound insulation materials are arranged, gypsum boards are installed, and joints of the adjacent gypsum boards are treated. The gypsum board decorative wall construction process achieves the effect of reducing abrasion between the vertical keels and the top keel and between the vertical keels and the ground keel.
本申请涉及一种石膏板装饰墙施工工艺,涉及室内装修的领域;其包括以下步骤:S1、根据设计施工图,在已做好的地面或者地枕带上,放出隔墙位臵线以及顶龙骨位臵边线;S2、依次安装沿顶龙骨、沿地龙骨;S3、依据设计要求,在沿顶龙骨以及沿地龙骨之间,间隔适宜距离设置定位组件,并基于定位组件安装竖龙骨,定位组件用于减小竖龙骨与沿顶龙骨以及沿地龙骨之间的磨损;S4、依据设计要求,设置横向卡档龙骨,并通过卡紧组件将卡档龙骨与竖龙骨卡紧;S5、设置隔音材料,对石膏板进行安装,并对相邻石膏板接缝处进行处理。本申请达到了减小竖龙骨与沿顶龙骨以及沿地龙骨之间的磨损的效果。
Gypsum board decorative wall construction process
The invention relates to a gypsum board decorative wall construction process, and relates to the field of interior decoration. The gypsum board decorative wall construction process comprises the following steps that S1, according to a design construction drawing, a partition wall position line and a top keel position line are set on a made ground or a ground sleeper belt; S2, a top keel and a ground keel are sequentially installed; S3, according to the design requirements, positioning assemblies are arranged between the top keel and the ground keel at proper intervals, vertical keels are installed based on the positioning assemblies, and the positioning assemblies are used for reducing abrasion between the vertical keels and the top keel and between the vertical keels and the ground keel; S4, according to the design requirements, transverse clamping keels are arranged, and the clamping keels and the vertical keels are clamped through clamping assemblies; and S5, sound insulation materials are arranged, gypsum boards are installed, and joints of the adjacent gypsum boards are treated. The gypsum board decorative wall construction process achieves the effect of reducing abrasion between the vertical keels and the top keel and between the vertical keels and the ground keel.
本申请涉及一种石膏板装饰墙施工工艺,涉及室内装修的领域;其包括以下步骤:S1、根据设计施工图,在已做好的地面或者地枕带上,放出隔墙位臵线以及顶龙骨位臵边线;S2、依次安装沿顶龙骨、沿地龙骨;S3、依据设计要求,在沿顶龙骨以及沿地龙骨之间,间隔适宜距离设置定位组件,并基于定位组件安装竖龙骨,定位组件用于减小竖龙骨与沿顶龙骨以及沿地龙骨之间的磨损;S4、依据设计要求,设置横向卡档龙骨,并通过卡紧组件将卡档龙骨与竖龙骨卡紧;S5、设置隔音材料,对石膏板进行安装,并对相邻石膏板接缝处进行处理。本申请达到了减小竖龙骨与沿顶龙骨以及沿地龙骨之间的磨损的效果。
Gypsum board decorative wall construction process
一种石膏板装饰墙施工工艺
CHEN XINGHAO (author) / YAO TINGTING (author) / ZHANG CHENYAN (author) / GUO LIANLIAN (author) / REN YI (author)
2021-12-14
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2021
|European Patent Office | 2022
|Production process of decorative gypsum board based on phase change microcapsule technology
European Patent Office | 2024
|Fluorescent gypsum decorative plate and preparation process thereof
European Patent Office | 2022
|European Patent Office | 2021
|