Construction method of wall surface finished board
The invention provides a construction method of a wall surface finished board. The method comprises the following steps that board seam positioning of the finished board is conducted on a wall surface base layer board; double-sided adhesive tape and structural adhesive are pasted on the back face of the finished board; according to preset typesetting of the finished board, the finished board is arranged, pasted and mounted, so that the finished board is mounted on the wall surface base layer board; and the mounting angle of the finished board is adjusted through the structural adhesive solidification time difference, so that the construction angle error of the finished board is adjusted. According to the construction method of the wall surface finished board, the double-sided adhesive tape and the structural adhesive are pasted on the back face of the finished board, after the finished board is mounted, the mounting angle of the finished board is adjusted through the structural adhesive solidification time difference, so that the construction angle error of the finished board is adjusted, and the finished board is pasted and fixed to be prevented from deforming and falling off through the characteristic of temporary fixing stability of the double-sided adhesive tape; and two adhesive forms are adopted, so that angle adjustment can be conducted after mounting of the finished board is completed, and the problems of accuracy of pasting and mounting of the wall surface finished board and loss reduction in the past are solved.
本发明提供了一种墙面成品板施工方法,该方法包括如下步骤:在墙面基层板上进行成品板的板缝定位;在成品板的背面上粘贴双面胶和结构胶;根据成品板的预设排版,对成品板进行布置粘贴和安装,以使成品板安装至墙面基层板上;利用结构胶凝固时间差,调整成品板安装角度,以调整成品板施工角度误差。本发明通过在品板的背面上粘贴双面胶和结构胶,并在成品板安装后,利用结构胶凝固时间差,调整成品板安装角度,以调整成品板施工角度误差,并利用双面胶临时固定稳定性的特点进行成品板粘贴固定防止变形和脱落,采用两种粘接剂形式,使成品板安装完毕后可以进行角度调整,解决以往墙面成品板粘贴安装的准确性和减少损耗的问题。
Construction method of wall surface finished board
The invention provides a construction method of a wall surface finished board. The method comprises the following steps that board seam positioning of the finished board is conducted on a wall surface base layer board; double-sided adhesive tape and structural adhesive are pasted on the back face of the finished board; according to preset typesetting of the finished board, the finished board is arranged, pasted and mounted, so that the finished board is mounted on the wall surface base layer board; and the mounting angle of the finished board is adjusted through the structural adhesive solidification time difference, so that the construction angle error of the finished board is adjusted. According to the construction method of the wall surface finished board, the double-sided adhesive tape and the structural adhesive are pasted on the back face of the finished board, after the finished board is mounted, the mounting angle of the finished board is adjusted through the structural adhesive solidification time difference, so that the construction angle error of the finished board is adjusted, and the finished board is pasted and fixed to be prevented from deforming and falling off through the characteristic of temporary fixing stability of the double-sided adhesive tape; and two adhesive forms are adopted, so that angle adjustment can be conducted after mounting of the finished board is completed, and the problems of accuracy of pasting and mounting of the wall surface finished board and loss reduction in the past are solved.
本发明提供了一种墙面成品板施工方法,该方法包括如下步骤:在墙面基层板上进行成品板的板缝定位;在成品板的背面上粘贴双面胶和结构胶;根据成品板的预设排版,对成品板进行布置粘贴和安装,以使成品板安装至墙面基层板上;利用结构胶凝固时间差,调整成品板安装角度,以调整成品板施工角度误差。本发明通过在品板的背面上粘贴双面胶和结构胶,并在成品板安装后,利用结构胶凝固时间差,调整成品板安装角度,以调整成品板施工角度误差,并利用双面胶临时固定稳定性的特点进行成品板粘贴固定防止变形和脱落,采用两种粘接剂形式,使成品板安装完毕后可以进行角度调整,解决以往墙面成品板粘贴安装的准确性和减少损耗的问题。
Construction method of wall surface finished board
一种墙面成品板施工方法
XU WEIGUANG (author) / WANG FENG (author) / WANG YINGGE (author) / TIAN JUNNIAN (author) / WEI RUYI (author) / YOU JUNQIANG (author) / CHEN LIANG (author)
2021-12-14
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
European Patent Office | 2021
|Construction method for plugging reserved hole of outer wall finished product
European Patent Office | 2024
|REPAIR WALL, REPAIR CEILING, AND REPAIR METHOD FOR TROWEL-FINISHED SURFACE
European Patent Office | 2016
|