Construction method for plugging reserved hole of outer wall finished product
The invention relates to building construction, in particular to a construction method for plugging a reserved hole of an outer wall finished product. Comprising the following steps: A, manufacturing a plugging template assembly; b, wall structure steel bars are bound, and lower fixing rods and upper fixing rods are pre-buried in the four corners of the reserved holes; c, a wall structure formwork is erected, and wall structure concrete is poured; d, cantilever scaffold I-shaped steel is installed, and the I-shaped steel is dismantled after construction of the outer wall face is completed; e, plugging the reserved hole; f, after concrete pouring is completed, a straight inserting plate is inserted into a straight inserting plate groove in the inner side of the wall body, and the wedge-shaped inserting plate is removed; and G, concrete curing. Construction is standard, operation is convenient, the construction efficiency is improved, the leakage risk is eradicated, the plugging effect is improved, and outer wall leakage is prevented.
本发明涉及建筑施工,特别是一种外墙成品预留孔洞封堵的施工方法。包括如下步骤:A、制作封堵模板组件;B、墙体结构钢筋绑扎,在预留孔洞的四角预埋下固定杆和上固定杆;C、支设墙体结构模板,浇筑墙体结构混凝土;D、安装悬挑脚手架工字钢,外墙面施工完毕,拆除工字钢;E、预留孔洞封堵;F、混凝土浇筑完成后,墙体内侧的直型插板槽内插入直型插板,拆除楔型插板;G、混凝土养护。本发明施工规范、操作便捷,提高施工效率,杜绝渗漏风险,提高封堵效果,防止外墙渗漏。
Construction method for plugging reserved hole of outer wall finished product
The invention relates to building construction, in particular to a construction method for plugging a reserved hole of an outer wall finished product. Comprising the following steps: A, manufacturing a plugging template assembly; b, wall structure steel bars are bound, and lower fixing rods and upper fixing rods are pre-buried in the four corners of the reserved holes; c, a wall structure formwork is erected, and wall structure concrete is poured; d, cantilever scaffold I-shaped steel is installed, and the I-shaped steel is dismantled after construction of the outer wall face is completed; e, plugging the reserved hole; f, after concrete pouring is completed, a straight inserting plate is inserted into a straight inserting plate groove in the inner side of the wall body, and the wedge-shaped inserting plate is removed; and G, concrete curing. Construction is standard, operation is convenient, the construction efficiency is improved, the leakage risk is eradicated, the plugging effect is improved, and outer wall leakage is prevented.
本发明涉及建筑施工,特别是一种外墙成品预留孔洞封堵的施工方法。包括如下步骤:A、制作封堵模板组件;B、墙体结构钢筋绑扎,在预留孔洞的四角预埋下固定杆和上固定杆;C、支设墙体结构模板,浇筑墙体结构混凝土;D、安装悬挑脚手架工字钢,外墙面施工完毕,拆除工字钢;E、预留孔洞封堵;F、混凝土浇筑完成后,墙体内侧的直型插板槽内插入直型插板,拆除楔型插板;G、混凝土养护。本发明施工规范、操作便捷,提高施工效率,杜绝渗漏风险,提高封堵效果,防止外墙渗漏。
Construction method for plugging reserved hole of outer wall finished product
外墙成品预留孔洞封堵的施工方法
LI WENTAO (author) / LU ZHANQUAN (author) / NING XIANGBO (author) / ZUO BIN (author)
2024-04-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Structural outer wall reserved hole plugging construction method
European Patent Office | 2021
|Concrete outer wall reserved hole plugging device and assembly
European Patent Office | 2024
|Foldable aluminum formwork for plugging reserved hole of outer wall and construction method
European Patent Office | 2024
|Plugging process for reserved hole in concrete outer wall of building
European Patent Office | 2022
|Method for plugging reserved hole in outer wall of attached lifting scaffold
European Patent Office | 2024
|