A platform for research: civil engineering, architecture and urbanism
Fixing device and fixing and mounting method for buried steel edge water stop of pipe gallery
The invention provides a fixing device and a mounting and fixing method for a buried steel edge water stop of a pipe gallery. The device comprises a supporting frame, two water stop fixing templates and two matching templates, wherein the two water stop fixing templates are oppositely arranged on the supporting frame, the two matching templates are detachably connected to the two water stop fixing templates correspondingly, and in addition, the side walls, away from the supporting frame, of the two matching templates are flush with the side walls, away from the supporting frame, of the two water stop fixing templates. According to the fixing device and the mounting and fixing method, the two water stop fixing templates oppositely arranged on the supporting frame are arranged at a middle circular ring of a water stop in a clamped mode so as to limit the water stop, so that the water stop is fixed, displacement deviation of the water stop is avoided, and the position of the water stop in concrete construction is guaranteed; and through the two matching templates on the two water stop fixing templates, the two matching templates and the two water stop fixing templates are matched to serve as a pouring template of a structural main body outside the water stop, so that pouring forming of the structural main body is carried out.
本发明提供了一种管廊中埋钢边止水带固定装置及安装固定方法。该装置包括:支撑架;两个止水带固定模板,两个止水带固定模板在支撑架上相对设置;两个配合模板,两个配合模板分别可拆卸地连接在两个止水带固定模板上,并且,两个配合模板远离支撑架的侧壁与两个止水带固定模板远离支撑架的侧壁平齐设置。本发明通过在支撑架上相对设置的两个止水带固定模板,卡设在止水带的中部圆环处,以对止水带进行限位使得止水带固定,放置止水带位移偏位,保证止水带在混凝土施工中的位置;通过两个止水带固定模板上的两个配合模板,使得两个配合模板和两个止水带固定模板配合作为止水带外部的结构主体的浇筑模板,以进行结构主体的浇筑成型。
Fixing device and fixing and mounting method for buried steel edge water stop of pipe gallery
The invention provides a fixing device and a mounting and fixing method for a buried steel edge water stop of a pipe gallery. The device comprises a supporting frame, two water stop fixing templates and two matching templates, wherein the two water stop fixing templates are oppositely arranged on the supporting frame, the two matching templates are detachably connected to the two water stop fixing templates correspondingly, and in addition, the side walls, away from the supporting frame, of the two matching templates are flush with the side walls, away from the supporting frame, of the two water stop fixing templates. According to the fixing device and the mounting and fixing method, the two water stop fixing templates oppositely arranged on the supporting frame are arranged at a middle circular ring of a water stop in a clamped mode so as to limit the water stop, so that the water stop is fixed, displacement deviation of the water stop is avoided, and the position of the water stop in concrete construction is guaranteed; and through the two matching templates on the two water stop fixing templates, the two matching templates and the two water stop fixing templates are matched to serve as a pouring template of a structural main body outside the water stop, so that pouring forming of the structural main body is carried out.
本发明提供了一种管廊中埋钢边止水带固定装置及安装固定方法。该装置包括:支撑架;两个止水带固定模板,两个止水带固定模板在支撑架上相对设置;两个配合模板,两个配合模板分别可拆卸地连接在两个止水带固定模板上,并且,两个配合模板远离支撑架的侧壁与两个止水带固定模板远离支撑架的侧壁平齐设置。本发明通过在支撑架上相对设置的两个止水带固定模板,卡设在止水带的中部圆环处,以对止水带进行限位使得止水带固定,放置止水带位移偏位,保证止水带在混凝土施工中的位置;通过两个止水带固定模板上的两个配合模板,使得两个配合模板和两个止水带固定模板配合作为止水带外部的结构主体的浇筑模板,以进行结构主体的浇筑成型。
Fixing device and fixing and mounting method for buried steel edge water stop of pipe gallery
一种管廊中埋钢边止水带固定装置及固定安装方法
KONG XIAOLONG (author) / LI HONGYAN (author) / QIN XINGSHUO (author) / DI HAO (author) / DONG JUN (author) / GUO SHENGXIAN (author) / WU TIEWEI (author)
2021-12-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery middle-buried steel edge water stop belt positioning and mounting system and method
European Patent Office | 2021
|Mounting and fixing device of pipe gallery deformation joint water-stop belt and construction method
European Patent Office | 2020
|European Patent Office | 2020
|Fixing structure of middle-buried steel-edge water stop belt and construction method
European Patent Office | 2021
|Device for fixing back-attached water-stop belt of pipe gallery and construction method
European Patent Office | 2020
|