A platform for research: civil engineering, architecture and urbanism
Rotational flow pool construction method
The invention particularly relates to a rotational flow pool construction method. The rotational flow pool construction method comprises the following steps of S1, determining the position of a ceiling embedded part of a rotational flow pool, and accurately paying off and positioning; S2, manufacturing a ceiling structure of the rotational flow pool, processing the ceiling structure according to a design drawing; S3, mounting a ceiling structure of the rotational flow pool, completing the hoisting operation in place, performing safety check confirmation on the hoisting sling to ensure that the hoisting sling is in an intact state, and confirming the safety measure implementation condition and the hoisting environment to ensure hoisting installation; S4, welding of the ceiling of the rotational flow pool is completed; and S5, constructing of the rotational flow pool. According to the method, optimized and improved construction is carried out in the conventional rotational flow pool opening construction stage, so that rotational flow pool construction can be continuously carried out in rainy and foggy weather and is not influenced by the rainy and foggy weather, the construction period is shortened, the project quality is improved, and the safety risk is reduced.
本发明具体是一种旋流池施工方法,包括步骤1、确定旋流池顶棚预埋件位置,精确放线定位;步骤2、旋流池顶棚结构制作:根据设计图纸进行顶棚结构加工;步骤3、旋流池顶棚结构安装;起重作业前交底到位,对起重吊具进行安全检查确认,确保吊索具处于完好状态,并对安全措施落实情况及吊装环境进行确认,以确保吊装安装;步骤4、旋流池顶棚焊接完成;步骤5、旋流池施工。本发明在常规旋流池开口施工阶段进行了优化改进施工,使旋流池施工能在雨雾天气连续作业,不受雨雾天气影响,缩短了工期,提高工程质量和降低安全风险。
Rotational flow pool construction method
The invention particularly relates to a rotational flow pool construction method. The rotational flow pool construction method comprises the following steps of S1, determining the position of a ceiling embedded part of a rotational flow pool, and accurately paying off and positioning; S2, manufacturing a ceiling structure of the rotational flow pool, processing the ceiling structure according to a design drawing; S3, mounting a ceiling structure of the rotational flow pool, completing the hoisting operation in place, performing safety check confirmation on the hoisting sling to ensure that the hoisting sling is in an intact state, and confirming the safety measure implementation condition and the hoisting environment to ensure hoisting installation; S4, welding of the ceiling of the rotational flow pool is completed; and S5, constructing of the rotational flow pool. According to the method, optimized and improved construction is carried out in the conventional rotational flow pool opening construction stage, so that rotational flow pool construction can be continuously carried out in rainy and foggy weather and is not influenced by the rainy and foggy weather, the construction period is shortened, the project quality is improved, and the safety risk is reduced.
本发明具体是一种旋流池施工方法,包括步骤1、确定旋流池顶棚预埋件位置,精确放线定位;步骤2、旋流池顶棚结构制作:根据设计图纸进行顶棚结构加工;步骤3、旋流池顶棚结构安装;起重作业前交底到位,对起重吊具进行安全检查确认,确保吊索具处于完好状态,并对安全措施落实情况及吊装环境进行确认,以确保吊装安装;步骤4、旋流池顶棚焊接完成;步骤5、旋流池施工。本发明在常规旋流池开口施工阶段进行了优化改进施工,使旋流池施工能在雨雾天气连续作业,不受雨雾天气影响,缩短了工期,提高工程质量和降低安全风险。
Rotational flow pool construction method
一种旋流池施工方法
ZENG WENKUI (author) / GUO TENGFEI (author) / GAO WUJIU (author)
2021-12-17
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Construction method for rotational flow pool bottom of bloom continuous casting machine
European Patent Office | 2022
|Constricted space rotational flow pool sinking protection structure and construction method thereof
European Patent Office | 2024
|Construction method for bottom of rotational flow pool of continuous casting machine
European Patent Office | 2024
|