Jet grouting pile construction method
The invention discloses a jet grouting pile construction method. The jet grouting pile construction method comprises the following steps that a construction site is leveled; pile position measuring and positioning are conducted; a drilling machine is in place, and drilling is conducted; hole guiding and drilling are conducted; jet pipe high-pressure jet grouting and jet pipe lifting are conducted repeatedly; machines and tools are flushed; and a jet pipe is moved to the next hole position till all jet grouting piles are completed. By means of the jet grouting construction method, construction can be conducted in a narrow space, construction equipment is compact, and the construction process is simple.
本发明公开了一种旋喷桩施工方法,包括以下步骤:施工场地平整;桩位测量定位;钻机就位、钻孔;引孔、钻进;重复进行喷管高压旋喷注浆、提升喷管;冲洗机具;移动喷管至下一孔位,直至完成全部旋喷桩。利用旋喷施工方法能够在狭小的空间施工,且施工设备紧凑,施工过程简单。
Jet grouting pile construction method
The invention discloses a jet grouting pile construction method. The jet grouting pile construction method comprises the following steps that a construction site is leveled; pile position measuring and positioning are conducted; a drilling machine is in place, and drilling is conducted; hole guiding and drilling are conducted; jet pipe high-pressure jet grouting and jet pipe lifting are conducted repeatedly; machines and tools are flushed; and a jet pipe is moved to the next hole position till all jet grouting piles are completed. By means of the jet grouting construction method, construction can be conducted in a narrow space, construction equipment is compact, and the construction process is simple.
本发明公开了一种旋喷桩施工方法,包括以下步骤:施工场地平整;桩位测量定位;钻机就位、钻孔;引孔、钻进;重复进行喷管高压旋喷注浆、提升喷管;冲洗机具;移动喷管至下一孔位,直至完成全部旋喷桩。利用旋喷施工方法能够在狭小的空间施工,且施工设备紧凑,施工过程简单。
Jet grouting pile construction method
旋喷桩施工方法
PENG QUAN (author) / LI XUDONG (author) / WU DI (author) / DU FULI (author) / ZHANG HUIDONG (author) / YU XIAODONG (author) / DONG ZHIGUO (author) / LIU CHAO (author)
2021-12-21
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Grouting device and pile tip post-grouting construction method
European Patent Office | 2022
|Pile end post-grouting device, grouting method and construction method of CFG pile
European Patent Office | 2022
|Ultrahigh-pressure jet grouting pile machine and jet grouting pile construction method
European Patent Office | 2022
|