A platform for research: civil engineering, architecture and urbanism
Construction method for replacing railway masonry beam through walking trolley
The invention discloses a construction method for replacing a railway masonry beam through a walking trolley, and belongs to the technical field of building construction. The method comprises the steps of site arrangement, walking trolley assembly, new beam entry, line preparation, old beam removal, supporting padstone treatment, new beam in-place and line recovery. According to the construction method, the BIM technology is combined with the walking trolley, so that the existing railway bridge beam replacement construction site is fast in planning, the process is more standard, the in-site time is shorter, and line recovery is faster.
本发明为一种走行台车更换铁路圬工梁的施工方法,属于建筑施工技术领域。该方法包括场地布置、组装走行台车、新梁进场、线路准备、移出旧梁、处理支撑垫石、新梁就位、恢复线路步骤。本发明施工方法通过BIM技术与走行台车的结合,使得既有铁路桥梁换梁施工场地规划快、程序更加规范、点内用时更短、恢复线路更快。
Construction method for replacing railway masonry beam through walking trolley
The invention discloses a construction method for replacing a railway masonry beam through a walking trolley, and belongs to the technical field of building construction. The method comprises the steps of site arrangement, walking trolley assembly, new beam entry, line preparation, old beam removal, supporting padstone treatment, new beam in-place and line recovery. According to the construction method, the BIM technology is combined with the walking trolley, so that the existing railway bridge beam replacement construction site is fast in planning, the process is more standard, the in-site time is shorter, and line recovery is faster.
本发明为一种走行台车更换铁路圬工梁的施工方法,属于建筑施工技术领域。该方法包括场地布置、组装走行台车、新梁进场、线路准备、移出旧梁、处理支撑垫石、新梁就位、恢复线路步骤。本发明施工方法通过BIM技术与走行台车的结合,使得既有铁路桥梁换梁施工场地规划快、程序更加规范、点内用时更短、恢复线路更快。
Construction method for replacing railway masonry beam through walking trolley
走行台车更换铁路圬工梁的施工方法
LIU KELIANG (author) / SHANG PEIPEI (author) / GE PENG (author) / WANG FULIANG (author) / ZHAO JINTAO (author) / AI BING (author) / HE CHENYANG (author) / WANG ZHIWEI (author) / QIU KAIFEI (author) / CHEN HAO (author)
2021-12-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Transverse moving walking track of railway beam moving trolley
European Patent Office | 2021
|Rail welding trolley multiple rail welding replacing construction method
European Patent Office | 2015
|Tool for replacing beam bottom inspection trolley and use mode
European Patent Office | 2024
|