A platform for research: civil engineering, architecture and urbanism
The invention relates to the field of shampoo preparation, in particular to a system and method for preparing shampoo containing plant essence. The multi-layer steel truss building construction device comprises a two-way push rod, two long-strip frames, bottom bulging bases, triangular frames, rotating wheels and square frames, wherein the two long-strip frames are arranged in a mirror symmetry mode, each building base is arranged at the lower end of each long-strip frame, the two bulging bases are fixedly connected to the two movable ends of the two-way push rod respectively, each square frame is arranged on each of the front side and the rear side of the middle of the lower side of each long-strip frame, each triangular frame is arranged at each of the four corners of the inner side of each long-strip frame, and each rotating wheel is movably connected to each triangular frame. In order to conveniently support and fix a multi-layer steel truss on a building construction site, the multi-layer steel truss is placed between the two long-strip frames before working, one end of the multi-layer steel truss is placed from one ends of the two long-strip frames during placement, and then the multi-layer steel truss is conveniently pushed through the rotating wheels on the upper sides and the lower sides of the long-strip frames, so that time and labor are saved.
本发明涉及洗发水制备领域,更具体的说是一种含有植物精华洗发水制备系统及制备方法。所述多层钢桁架建筑施工装置包括双向推杆、长条架、底凸座、三角架、转轮和方框,长条架设有两个,两个长条架镜像对称设置,每个长条架下端均设有一个凸座,两个凸座分别固接在双向推杆的两个活动端,每个长条架下侧中部的前后两侧均设有一个方框,每个长条架内侧的四角处均设有一个三角架,每个三角架上均活动连接一个转轮。本发明为便于为便于将建筑施工工地的多层钢桁架支起并且进行固定,工作之前将多层钢桁架置入两个长条架之间,放置时将多层钢桁架的一端由两个长条架的一端放入,进而长条架上下两侧的转轮便于推动多层钢桁架省时省力。
The invention relates to the field of shampoo preparation, in particular to a system and method for preparing shampoo containing plant essence. The multi-layer steel truss building construction device comprises a two-way push rod, two long-strip frames, bottom bulging bases, triangular frames, rotating wheels and square frames, wherein the two long-strip frames are arranged in a mirror symmetry mode, each building base is arranged at the lower end of each long-strip frame, the two bulging bases are fixedly connected to the two movable ends of the two-way push rod respectively, each square frame is arranged on each of the front side and the rear side of the middle of the lower side of each long-strip frame, each triangular frame is arranged at each of the four corners of the inner side of each long-strip frame, and each rotating wheel is movably connected to each triangular frame. In order to conveniently support and fix a multi-layer steel truss on a building construction site, the multi-layer steel truss is placed between the two long-strip frames before working, one end of the multi-layer steel truss is placed from one ends of the two long-strip frames during placement, and then the multi-layer steel truss is conveniently pushed through the rotating wheels on the upper sides and the lower sides of the long-strip frames, so that time and labor are saved.
本发明涉及洗发水制备领域,更具体的说是一种含有植物精华洗发水制备系统及制备方法。所述多层钢桁架建筑施工装置包括双向推杆、长条架、底凸座、三角架、转轮和方框,长条架设有两个,两个长条架镜像对称设置,每个长条架下端均设有一个凸座,两个凸座分别固接在双向推杆的两个活动端,每个长条架下侧中部的前后两侧均设有一个方框,每个长条架内侧的四角处均设有一个三角架,每个三角架上均活动连接一个转轮。本发明为便于为便于将建筑施工工地的多层钢桁架支起并且进行固定,工作之前将多层钢桁架置入两个长条架之间,放置时将多层钢桁架的一端由两个长条架的一端放入,进而长条架上下两侧的转轮便于推动多层钢桁架省时省力。
Multi-layer steel truss building construction method
一种多层钢桁架建筑施工方法
LIU MALI (author)
2021-12-31
Patent
Electronic Resource
Chinese
Building reinforcing layer steel structure outrigger truss
European Patent Office | 2023
|Medium and large steel truss girder building construction method
European Patent Office | 2020
|