Assembly line prefabrication system and method of immersed tube
The invention relates to the technical field of immersed tubes, in particular to an assembly line prefabrication system and method of an immersed tube. The prefabrication system comprises a steel bar machining area, a steel bar binding area, a pile platform and a steel buoyancy tank which are sequentially arranged, the steel bar machining area is located on the land, the steel bar binding area is located on the land or the pile platform, the pile platform is located at the junction of water and land, the steel buoyancy tank is arranged in the water area, the steel buoyancy tank is used for pouring, outfitting and launching of the immersed tube, the pile platform is in butt joint with the steel buoyancy tank, and land equipment enters and exits from the steel buoyancy tank through the pile platform. The assembly line prefabrication system of the immersed tube is a factory system combining an overwater platform and a shore platform, a pouring area and an outfitting area of a factory are combined into one buoyancy tank platform area which serves as the shared area for pouring and outfitting of the immersed tube; and a full-length inner mold process is adopted for pouring to improve the pouring progress, an outfitting sealing door adopts a sealing door-steel beam integrated structure and a sealing door pull fitting installation process, so that the outfitting installation progress is improved, the total construction period of pouring and outfitting is approximate to the steel bar binding construction period, and pouring and outfitting are just matched to form assembly line production.
本发明涉及沉管技术领域,具体涉及一种沉管流水线预制系统和预制方法,预制系统包括依次设置的钢筋加工区、钢筋绑扎区、桩平台和钢浮箱,钢筋加工区位于陆地,钢筋绑扎区位于陆地或桩平台,桩平台位于水陆交界处,钢浮箱设置于水域,钢浮箱用于沉管浇筑、舾装和下水,桩平台和钢浮箱对接,陆地设备通过桩平台进入和退出钢浮箱。本发明是一种水上平台和岸上平台相组合的工厂体系,将工厂的浇筑区和舾装区合并为一个浮箱平台区域作为沉管浇筑和舾装的共同区域,浇筑采用通长内模工艺提高浇筑进度,舾装封门采用封门‑钢梁一体结构和封门拉合安装工艺提高了舾装安装进度,使浇筑和舾装的工期加起来与钢筋绑扎的工期接近,两者刚好匹配形成流水生产。
Assembly line prefabrication system and method of immersed tube
The invention relates to the technical field of immersed tubes, in particular to an assembly line prefabrication system and method of an immersed tube. The prefabrication system comprises a steel bar machining area, a steel bar binding area, a pile platform and a steel buoyancy tank which are sequentially arranged, the steel bar machining area is located on the land, the steel bar binding area is located on the land or the pile platform, the pile platform is located at the junction of water and land, the steel buoyancy tank is arranged in the water area, the steel buoyancy tank is used for pouring, outfitting and launching of the immersed tube, the pile platform is in butt joint with the steel buoyancy tank, and land equipment enters and exits from the steel buoyancy tank through the pile platform. The assembly line prefabrication system of the immersed tube is a factory system combining an overwater platform and a shore platform, a pouring area and an outfitting area of a factory are combined into one buoyancy tank platform area which serves as the shared area for pouring and outfitting of the immersed tube; and a full-length inner mold process is adopted for pouring to improve the pouring progress, an outfitting sealing door adopts a sealing door-steel beam integrated structure and a sealing door pull fitting installation process, so that the outfitting installation progress is improved, the total construction period of pouring and outfitting is approximate to the steel bar binding construction period, and pouring and outfitting are just matched to form assembly line production.
本发明涉及沉管技术领域,具体涉及一种沉管流水线预制系统和预制方法,预制系统包括依次设置的钢筋加工区、钢筋绑扎区、桩平台和钢浮箱,钢筋加工区位于陆地,钢筋绑扎区位于陆地或桩平台,桩平台位于水陆交界处,钢浮箱设置于水域,钢浮箱用于沉管浇筑、舾装和下水,桩平台和钢浮箱对接,陆地设备通过桩平台进入和退出钢浮箱。本发明是一种水上平台和岸上平台相组合的工厂体系,将工厂的浇筑区和舾装区合并为一个浮箱平台区域作为沉管浇筑和舾装的共同区域,浇筑采用通长内模工艺提高浇筑进度,舾装封门采用封门‑钢梁一体结构和封门拉合安装工艺提高了舾装安装进度,使浇筑和舾装的工期加起来与钢筋绑扎的工期接近,两者刚好匹配形成流水生产。
Assembly line prefabrication system and method of immersed tube
一种沉管流水线预制系统和预制方法
ZHU CHENG (author) / LIANG BANGYAN (author) / DAI SHUANGQUAN (author) / LIU XUANYUAN (author) / OU WEISHAN (author) / PENG GANG (author) / ZHANG TAO (author) / CHEN JIANBIN (author) / ZOU ZHENGZHOU (author) / FANG JINTAO (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E02D
FOUNDATIONS
,
Gründungen
Construction method for immersed tube prefabrication and transportation
European Patent Office | 2021
|European Patent Office | 2020
|Final Joint of Immersed Tunnel as well as Prefabrication Method and Installation Method
European Patent Office | 2018
|Immersed tunnel rapid construction method based on flat ground pipe joint prefabrication
European Patent Office | 2022
|