A platform for research: civil engineering, architecture and urbanism
Foundation pile static load test loading main beam and counter-force pile connecting device
The invention provides a foundation pile static load test loading main beam and counter-force pile connecting device, and relates to the field of pile foundation vertical uplift resistance static load tests. The pile static load test loading main beam and counter-force pile connecting device comprises a foundation pile, the upper end of the foundation pile extends to form a plurality of main reinforcements, the main reinforcements are fixedly connected with a cohesion device, the upper end of the cohesion device is provided with a lower clamping plate, an upper clamping plate is arranged above the lower clamping plate, a main beam is arranged between the upper clamping plate and the lower clamping plate, the cohesion device comprises a shell, a lower cavity and an upper cavity are formed in the shell and distributed up and down, a plurality of conical holes are formed in the lower end of the shell and connected with the lower cavity, two clamping blocks are arranged in each conical hole, the side wall of each clamping block is a conical surface and is in sliding fit with the inner wall of the corresponding conical hole, and the two clamping blocks are clamped on the main reinforcements. The foundation pile can be quickly connected in a clamping mode, and the foundation pile is not treated.
本发明提供基桩静载试验加载主梁与反力桩连接装置,涉及桩基竖向抗拔静载试验领域。该桩静载试验加载主梁与反力桩连接装置,包括基桩,所述基桩的上端延伸有若干主筋,所述主筋上固定连接有抱合装置,所述抱合装置的上端设置有下夹板,所述下夹板的上方设置有上夹板,所述上夹板和下夹板之间设置有主梁,所述抱合装置包括壳体,所述壳体的内部设置有下腔室和上腔室,呈上下分布,且壳体的下端设置有若干锥形孔,所述锥形孔连接下腔室,所述锥形孔的内部设置有两块夹持块,所述夹持块的侧壁为锥面,并和锥形孔的内壁滑动配合,两块所述夹持块抱合在主筋。通过夹持的方式可以快速连接基桩,且不对基桩进行处理。
Foundation pile static load test loading main beam and counter-force pile connecting device
The invention provides a foundation pile static load test loading main beam and counter-force pile connecting device, and relates to the field of pile foundation vertical uplift resistance static load tests. The pile static load test loading main beam and counter-force pile connecting device comprises a foundation pile, the upper end of the foundation pile extends to form a plurality of main reinforcements, the main reinforcements are fixedly connected with a cohesion device, the upper end of the cohesion device is provided with a lower clamping plate, an upper clamping plate is arranged above the lower clamping plate, a main beam is arranged between the upper clamping plate and the lower clamping plate, the cohesion device comprises a shell, a lower cavity and an upper cavity are formed in the shell and distributed up and down, a plurality of conical holes are formed in the lower end of the shell and connected with the lower cavity, two clamping blocks are arranged in each conical hole, the side wall of each clamping block is a conical surface and is in sliding fit with the inner wall of the corresponding conical hole, and the two clamping blocks are clamped on the main reinforcements. The foundation pile can be quickly connected in a clamping mode, and the foundation pile is not treated.
本发明提供基桩静载试验加载主梁与反力桩连接装置,涉及桩基竖向抗拔静载试验领域。该桩静载试验加载主梁与反力桩连接装置,包括基桩,所述基桩的上端延伸有若干主筋,所述主筋上固定连接有抱合装置,所述抱合装置的上端设置有下夹板,所述下夹板的上方设置有上夹板,所述上夹板和下夹板之间设置有主梁,所述抱合装置包括壳体,所述壳体的内部设置有下腔室和上腔室,呈上下分布,且壳体的下端设置有若干锥形孔,所述锥形孔连接下腔室,所述锥形孔的内部设置有两块夹持块,所述夹持块的侧壁为锥面,并和锥形孔的内壁滑动配合,两块所述夹持块抱合在主筋。通过夹持的方式可以快速连接基桩,且不对基桩进行处理。
Foundation pile static load test loading main beam and counter-force pile connecting device
基桩静载试验加载主梁与反力桩连接装置
XU KAIKAI (author) / CUI LIBANG (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Static load test counter-force device for pull rod type steel bar pile-loading foundation pile
European Patent Office | 2024
|Counter-force device for pile foundation uplift static load test
European Patent Office | 2020
|Foundation pile compression-resistant static load test main beam connector
European Patent Office | 2015
|Spoke type force transfer connecting device for foundation pile static load test
European Patent Office | 2015
|Intelligent pile foundation static load test pile loading system and method
European Patent Office | 2024
|