A platform for research: civil engineering, architecture and urbanism
ETFE film tensioning construction process
The invention relates to an ETFE film tensioning construction process. The ETFE film tensioning construction process comprises the following steps that an ETFE film is hoisted, specifically, the ETFE film is packaged into a roll, and the roll is hoisted to the upper part of the middle part of a large-span arc-shaped steel-wood truss; the ETFE film is laid, specifically, the ETFE film which is packed into the roll is untied to and laid on the upper surface of the large-span arc-shaped steel-wood truss; mounting is carried out before tensioning, specifically, a film boundary aluminum strip is mounted on the long edge of the ETFE film; the ETFE film is tensioned, specifically, a plurality of tensioning devices are mounted on the large-span arc-shaped steel-wood truss, the tensioning devices are connected with the film boundary aluminum strip, and meanwhile, tension is applied in the direction far away from the ETFE film so as to lengthen the ETFE film; and fixing is carried out after tensioning, specifically, after the film boundary aluminum strip is tensioned in place, the tensioning devices are detached from the large-span arc-shaped steel-wood truss, and then the film boundary aluminum strip is mounted on the most edge of the large-span arc-shaped steel-wood truss. The ETFE film tensioning construction process has the effect of improving the construction progress of laying the ETFE film.
本申请涉及一种ETFE膜张拉施工工艺,包括以下步骤:ETFE膜吊装步骤:将ETFE膜打包成卷,然后吊装至大跨度弧形钢木桁架的中部上方;ETFE膜铺设步骤:解开打包成卷的ETFE膜,铺在大跨度弧形钢木桁架的上表面;张拉前安装步骤:将膜边界铝条安装在ETFE膜的长边缘;ETFE膜张拉步骤:在大跨度弧形钢木桁架上安装多个张拉装置,将张拉装置与膜边界铝条进行连接,同时往远离ETFE膜的方向施加拉力,从而把ETFE膜拉长;张拉后固定步骤:把膜边界铝条张拉到位后,将张拉装置从大跨度弧形钢木桁架上拆下,然后把膜边界铝条安装在大跨度弧形钢木桁架的最边上。本申请具有改善铺设ETFE膜的施工进度的效果。
ETFE film tensioning construction process
The invention relates to an ETFE film tensioning construction process. The ETFE film tensioning construction process comprises the following steps that an ETFE film is hoisted, specifically, the ETFE film is packaged into a roll, and the roll is hoisted to the upper part of the middle part of a large-span arc-shaped steel-wood truss; the ETFE film is laid, specifically, the ETFE film which is packed into the roll is untied to and laid on the upper surface of the large-span arc-shaped steel-wood truss; mounting is carried out before tensioning, specifically, a film boundary aluminum strip is mounted on the long edge of the ETFE film; the ETFE film is tensioned, specifically, a plurality of tensioning devices are mounted on the large-span arc-shaped steel-wood truss, the tensioning devices are connected with the film boundary aluminum strip, and meanwhile, tension is applied in the direction far away from the ETFE film so as to lengthen the ETFE film; and fixing is carried out after tensioning, specifically, after the film boundary aluminum strip is tensioned in place, the tensioning devices are detached from the large-span arc-shaped steel-wood truss, and then the film boundary aluminum strip is mounted on the most edge of the large-span arc-shaped steel-wood truss. The ETFE film tensioning construction process has the effect of improving the construction progress of laying the ETFE film.
本申请涉及一种ETFE膜张拉施工工艺,包括以下步骤:ETFE膜吊装步骤:将ETFE膜打包成卷,然后吊装至大跨度弧形钢木桁架的中部上方;ETFE膜铺设步骤:解开打包成卷的ETFE膜,铺在大跨度弧形钢木桁架的上表面;张拉前安装步骤:将膜边界铝条安装在ETFE膜的长边缘;ETFE膜张拉步骤:在大跨度弧形钢木桁架上安装多个张拉装置,将张拉装置与膜边界铝条进行连接,同时往远离ETFE膜的方向施加拉力,从而把ETFE膜拉长;张拉后固定步骤:把膜边界铝条张拉到位后,将张拉装置从大跨度弧形钢木桁架上拆下,然后把膜边界铝条安装在大跨度弧形钢木桁架的最边上。本申请具有改善铺设ETFE膜的施工进度的效果。
ETFE film tensioning construction process
一种ETFE膜张拉施工工艺
CHEN HUAQIANG (author) / HUANG CHUNWAN (author) / HAN YANG (author) / LI SHUYU (author) / AN ZHIWEI (author) / LYU MIAO (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
ETFE Apparatus for reinforcing insulation of structure used ETFE film
European Patent Office | 2020
|ETFE Apparatus for reinforcing insulation of structure used ETFE film
European Patent Office | 2020
|