A platform for research: civil engineering, architecture and urbanism
Comprehensive pipe gallery construction method and unilateral formwork structure of comprehensive pipe gallery side wall
The invention provides a comprehensive pipe gallery construction method and a unilateral formwork structure of a comprehensive pipe gallery side wall. The construction method comprises the following steps that a, a pit slot used for laying a comprehensive pipe gallery is dug; b, a bottom plate of the pipe gallery is poured; c, a reinforcing mesh in a mid-partition wall is bound on the bottom plate; d, then a middle partition wall formwork and a partition wall formwork support are erected, and concrete is poured; e, the pit slot side wall of the comprehensive pipe gallery is leveled, and the flat pit slot side wall serves as an outer side formwork of a pipe gallery side wall; f, the reinforcing mesh in the side wall of the comprehensive pipe gallery and the reinforcing mesh in a top plate are bound; g, an inner side formwork of the side wall is erected, an inner side formwork support is installed, and a top plate formwork support and a top plate formwork are erected; h, the concrete between the inner side formworks of the pit slot side walls and the side walls is poured, and then the concrete is poured on the top plate formwork of the comprehensive pipe gallery; and i, after the concrete is solidified, the inner side formwork of the side wall and the formwork support are dismantled, and pouring construction of the comprehensive pipe gallery is completed.
本发明提供了一种综合管廊施工方法以及综合管廊边墙的单侧支模结构,其中施工方法包括以下步骤:a、挖设用以铺设综合管廊的坑槽;b、浇筑管廊的底板;c、在底板上绑扎中隔墙内的钢筋网;d、然后支设中隔墙模板以及隔墙模板支撑,并浇筑混凝土;e、平整综合管廊的坑槽侧壁,以平坑槽侧壁作为管廊边墙的外侧模板;f、绑扎综合管廊边墙内的钢筋网以及顶板内的钢筋网;g、支设边墙的内侧模板以及安装内侧模板支撑,搭设顶板模板支架以及顶板模板;h、浇筑坑槽侧壁和边墙的内侧模板之间的混凝土,再浇筑综合管廊的顶板模板上浇筑混凝土;i、待混凝土凝固后,拆除边墙内侧模板以及模板支撑,即完成综合管廊的浇筑施工。
Comprehensive pipe gallery construction method and unilateral formwork structure of comprehensive pipe gallery side wall
The invention provides a comprehensive pipe gallery construction method and a unilateral formwork structure of a comprehensive pipe gallery side wall. The construction method comprises the following steps that a, a pit slot used for laying a comprehensive pipe gallery is dug; b, a bottom plate of the pipe gallery is poured; c, a reinforcing mesh in a mid-partition wall is bound on the bottom plate; d, then a middle partition wall formwork and a partition wall formwork support are erected, and concrete is poured; e, the pit slot side wall of the comprehensive pipe gallery is leveled, and the flat pit slot side wall serves as an outer side formwork of a pipe gallery side wall; f, the reinforcing mesh in the side wall of the comprehensive pipe gallery and the reinforcing mesh in a top plate are bound; g, an inner side formwork of the side wall is erected, an inner side formwork support is installed, and a top plate formwork support and a top plate formwork are erected; h, the concrete between the inner side formworks of the pit slot side walls and the side walls is poured, and then the concrete is poured on the top plate formwork of the comprehensive pipe gallery; and i, after the concrete is solidified, the inner side formwork of the side wall and the formwork support are dismantled, and pouring construction of the comprehensive pipe gallery is completed.
本发明提供了一种综合管廊施工方法以及综合管廊边墙的单侧支模结构,其中施工方法包括以下步骤:a、挖设用以铺设综合管廊的坑槽;b、浇筑管廊的底板;c、在底板上绑扎中隔墙内的钢筋网;d、然后支设中隔墙模板以及隔墙模板支撑,并浇筑混凝土;e、平整综合管廊的坑槽侧壁,以平坑槽侧壁作为管廊边墙的外侧模板;f、绑扎综合管廊边墙内的钢筋网以及顶板内的钢筋网;g、支设边墙的内侧模板以及安装内侧模板支撑,搭设顶板模板支架以及顶板模板;h、浇筑坑槽侧壁和边墙的内侧模板之间的混凝土,再浇筑综合管廊的顶板模板上浇筑混凝土;i、待混凝土凝固后,拆除边墙内侧模板以及模板支撑,即完成综合管廊的浇筑施工。
Comprehensive pipe gallery construction method and unilateral formwork structure of comprehensive pipe gallery side wall
一种综合管廊施工方法以及综合管廊边墙的单侧支模结构
HE QINGYI (author) / GUO HUAXIN (author)
2022-01-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Outer side formwork and formwork system for comprehensive pipe gallery construction
European Patent Office | 2024
|Comprehensive pipe gallery single-side tool type formwork construction method
European Patent Office | 2020
|European Patent Office | 2021
|Comprehensive pipe gallery hydraulic formwork trolley and construction method
European Patent Office | 2023
|Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
European Patent Office | 2020
|