Lifting frame and construction method
The invention relates to a lifting frame and a construction method. The lifting frame comprises a fixing assembly and at least one connecting rod, at least one through hole is formed in the fixing assembly in the first direction of the fixing assembly, the connecting rods are arranged in the through holes in a penetrating mode, the outer circumferential walls of the connecting rods abut against the inner circumferential walls of the through holes, the connecting rods and the through holes are arranged in a one-to-one correspondence mode, and the connecting rods and the fixing assembly are detachably connected. The construction method comprises the following steps of mounting the hoisting frame, mounting the connecting rods and dismounting the fixing assembly. According to the lifting frame and the construction method, the fixing assembly is arranged and is used for fixing the connecting rods, in the lifting process, the multiple connecting rods can be lifted at a time, meanwhile, the multiple connecting rods can be mounted, and therefore the construction efficiency is improved, and the construction period is shortened.
本发明涉及一种吊装架及施工方法,该吊装架包括包括固定组件以及至少一个连接杆;固定组件上沿着固定组件的第一方向开设有至少一个通孔,连接杆穿设于通孔内,连接杆的外周壁与通孔的内周壁抵接,连接杆与通孔一一对应设置,连接杆与固定组件可拆卸连接;施工方法的流程为:安装吊装架‑连接杆安装‑拆除固定组件;通过设置固定组件,固定组件用于固定连接杆,在吊运过程中,可一次吊运多个连接杆,同时,可对多个连接杆进行安装,由此,提高了施工效率,缩短了施工工期。
Lifting frame and construction method
The invention relates to a lifting frame and a construction method. The lifting frame comprises a fixing assembly and at least one connecting rod, at least one through hole is formed in the fixing assembly in the first direction of the fixing assembly, the connecting rods are arranged in the through holes in a penetrating mode, the outer circumferential walls of the connecting rods abut against the inner circumferential walls of the through holes, the connecting rods and the through holes are arranged in a one-to-one correspondence mode, and the connecting rods and the fixing assembly are detachably connected. The construction method comprises the following steps of mounting the hoisting frame, mounting the connecting rods and dismounting the fixing assembly. According to the lifting frame and the construction method, the fixing assembly is arranged and is used for fixing the connecting rods, in the lifting process, the multiple connecting rods can be lifted at a time, meanwhile, the multiple connecting rods can be mounted, and therefore the construction efficiency is improved, and the construction period is shortened.
本发明涉及一种吊装架及施工方法,该吊装架包括包括固定组件以及至少一个连接杆;固定组件上沿着固定组件的第一方向开设有至少一个通孔,连接杆穿设于通孔内,连接杆的外周壁与通孔的内周壁抵接,连接杆与通孔一一对应设置,连接杆与固定组件可拆卸连接;施工方法的流程为:安装吊装架‑连接杆安装‑拆除固定组件;通过设置固定组件,固定组件用于固定连接杆,在吊运过程中,可一次吊运多个连接杆,同时,可对多个连接杆进行安装,由此,提高了施工效率,缩短了施工工期。
Lifting frame and construction method
一种吊装架及施工方法
ZHANG LE (author) / WANG HUI (author) / SHI HONGJIAN (author) / GUO QUANYU (author)
2022-01-18
Patent
Electronic Resource
Chinese