A platform for research: civil engineering, architecture and urbanism
Mounting process of fabricated building structure
The invention discloses a mounting process of a fabricated building structure, and relates to the technical field of assembly buildings. The mounting process comprises the following steps: firstly, a constructor performs size checking and paying-off on site, then, installs and levels a keel, checks whether the keel is leveled without loosening, measures the horizontal height of the internal and external corners, performs elevation, and fixs the internal and external corners on the keel, then, makes the lining plate horizontally and vertically installed on the keel, so that the lining plate and the internal corners are tightly combined, and no visible gap exists, then, installs a buckle assembly and a decorative wall body plate to make the decorative wall body plate fixed to the keel; and finally, installs matched components. The mounting process of the fabricated building structure has the advantages of being convenient to mount on site, high in structural strength and high in attractiveness, and is beneficial to being popularized and used in fabricated buildings.
本发明公开了一种装配式建筑结构的安装工艺,涉及装配建筑技术领域,包括以下步骤:首先施工人员在现场进行复尺放线;然后安装龙骨并调平龙骨;检查龙骨是否调平无松动,测量阴阳角水平高度,进行标高,将阴阳角固定在龙骨上;接着将衬板横平竖直的安装在龙骨上,使衬板和阴角紧密结合,无可见缝隙;然后安装卡扣组件、安装装饰墙体板,以使装饰墙体板固定在龙骨上;最后安装配套部品部件。本发明提供的一种装配式建筑结构的安装工艺,具有现场安装方便、结构强度高、美观性高的优点,利于在装配式建筑中推广使用。
Mounting process of fabricated building structure
The invention discloses a mounting process of a fabricated building structure, and relates to the technical field of assembly buildings. The mounting process comprises the following steps: firstly, a constructor performs size checking and paying-off on site, then, installs and levels a keel, checks whether the keel is leveled without loosening, measures the horizontal height of the internal and external corners, performs elevation, and fixs the internal and external corners on the keel, then, makes the lining plate horizontally and vertically installed on the keel, so that the lining plate and the internal corners are tightly combined, and no visible gap exists, then, installs a buckle assembly and a decorative wall body plate to make the decorative wall body plate fixed to the keel; and finally, installs matched components. The mounting process of the fabricated building structure has the advantages of being convenient to mount on site, high in structural strength and high in attractiveness, and is beneficial to being popularized and used in fabricated buildings.
本发明公开了一种装配式建筑结构的安装工艺,涉及装配建筑技术领域,包括以下步骤:首先施工人员在现场进行复尺放线;然后安装龙骨并调平龙骨;检查龙骨是否调平无松动,测量阴阳角水平高度,进行标高,将阴阳角固定在龙骨上;接着将衬板横平竖直的安装在龙骨上,使衬板和阴角紧密结合,无可见缝隙;然后安装卡扣组件、安装装饰墙体板,以使装饰墙体板固定在龙骨上;最后安装配套部品部件。本发明提供的一种装配式建筑结构的安装工艺,具有现场安装方便、结构强度高、美观性高的优点,利于在装配式建筑中推广使用。
Mounting process of fabricated building structure
一种装配式建筑结构的安装工艺
LIU GUANGYUN (author) / KE YULIN (author) / WANG SHUAIHU (author)
2022-01-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated steel-wood building structure and mounting process thereof
European Patent Office | 2023
|Fabricated green building steel structure and mounting process thereof
European Patent Office | 2022
|