Split type trolley and tunnel construction method adopting same
The invention discloses a split type trolley and a tunnel construction method adopting the split type trolley, and relates to the technical field of buildings. Wherein the split type trolley comprises a side formwork trolley and an upper formwork trolley, the side formwork trolley comprises a first support, a first formwork assembly, a first driving device, a first walking device and a first lifting device, and the upper formwork trolley comprises a second support, a second formwork assembly, a second driving device, a second walking device and a second lifting device. The side formwork trolley pours side concrete of a pipe gallery, the upper formwork trolley pours concrete above the pipe gallery, through cooperation of the side formwork trolley and the upper formwork trolley, the side edges and the upper end of the pipe gallery are poured separately, the working efficiency can be improved, and the construction time can be shortened.
本发明公开了一种分体式台车及采用其的隧道施工方法,涉及建筑技术领域。其中,分体式台车包括边模台车和上模台车,边模台车包括第一支架、第一模板组件、第一驱动装置、第一行走装置和第一升降装置,上模台车包括第二支架、第二模板组件、第二驱动装置、第二行走装置和第二升降装置。边模台车浇筑管廊的侧边混凝土,上模台车浇筑管廊上方的混凝土,通过边模台车与上模台车的配合,将管廊的侧边和上端分开浇筑,能提高工作效率,缩短施工时间。
Split type trolley and tunnel construction method adopting same
The invention discloses a split type trolley and a tunnel construction method adopting the split type trolley, and relates to the technical field of buildings. Wherein the split type trolley comprises a side formwork trolley and an upper formwork trolley, the side formwork trolley comprises a first support, a first formwork assembly, a first driving device, a first walking device and a first lifting device, and the upper formwork trolley comprises a second support, a second formwork assembly, a second driving device, a second walking device and a second lifting device. The side formwork trolley pours side concrete of a pipe gallery, the upper formwork trolley pours concrete above the pipe gallery, through cooperation of the side formwork trolley and the upper formwork trolley, the side edges and the upper end of the pipe gallery are poured separately, the working efficiency can be improved, and the construction time can be shortened.
本发明公开了一种分体式台车及采用其的隧道施工方法,涉及建筑技术领域。其中,分体式台车包括边模台车和上模台车,边模台车包括第一支架、第一模板组件、第一驱动装置、第一行走装置和第一升降装置,上模台车包括第二支架、第二模板组件、第二驱动装置、第二行走装置和第二升降装置。边模台车浇筑管廊的侧边混凝土,上模台车浇筑管廊上方的混凝土,通过边模台车与上模台车的配合,将管廊的侧边和上端分开浇筑,能提高工作效率,缩短施工时间。
Split type trolley and tunnel construction method adopting same
分体式台车及采用其的隧道施工方法
JIN JIANWEI (author) / CHEN GUOCHANG (author) / CHEN MEITING (author) / ZHENG YANGRUI (author) / LIU ZHICHENG (author) / ZHU YONGLIANG (author) / HE ZIXING (author) / LI CHUAN (author) / CHEN CHAOHENG (author) / DIAO JINHUA (author)
2022-02-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Semi-automatic tunnel suction type mud cleaning trolley and construction method thereof
European Patent Office | 2022
|