A platform for research: civil engineering, architecture and urbanism
Novel connecting method for bearing platform and prefabricated pier
The invention relates to a novel connecting method for a bearing platform and a prefabricated pier, which mainly comprises the bearing platform (2) and the prefabricated pier (1), a plurality of side-by-side steel plates (3) are arranged in the center of the upper surface of the bearing platform (2), and steel plate preformed holes (5) are formed in the center of the upper surface of the bearing platform (2); the prefabricated pier (1) is one of a cylinder type, a cuboid type and a cube type, a plurality of hollow grooves (7) are formed in the bottom of the prefabricated pier (1), the size of the hollow grooves (7) matches that of the steel plates (3) on the bearing platform (2), and the prefabricated pier (1) is provided with pier preformed holes (4). According to the connecting method, the prefabricated pier (1) and the bearing platform (2) can be rapidly connected, the structure meets the industrial building requirement, the construction speed is high, the efficiency is high, and the quality is guaranteed.
本发明是一种新型承台与预制桥墩的连接方法,主要包括承台(2)与预制桥墩(1),承台(2)上表面中央含有若干块并排的钢板(3),并设有钢板预留孔(5);预制桥墩(1)是圆柱式、长方体、正方体中的一种,在预制桥墩(1)的底部含有若干块空心槽(7),大小与承台(2)上的钢板(3)相匹配,并设有桥墩预留孔(4)。本发明的连接方法能够实现预制桥墩(1)和承台(2)之间的快速连接,并且使结构满足工业化的建造要求,施工速度快,效率高,质量有保障。
Novel connecting method for bearing platform and prefabricated pier
The invention relates to a novel connecting method for a bearing platform and a prefabricated pier, which mainly comprises the bearing platform (2) and the prefabricated pier (1), a plurality of side-by-side steel plates (3) are arranged in the center of the upper surface of the bearing platform (2), and steel plate preformed holes (5) are formed in the center of the upper surface of the bearing platform (2); the prefabricated pier (1) is one of a cylinder type, a cuboid type and a cube type, a plurality of hollow grooves (7) are formed in the bottom of the prefabricated pier (1), the size of the hollow grooves (7) matches that of the steel plates (3) on the bearing platform (2), and the prefabricated pier (1) is provided with pier preformed holes (4). According to the connecting method, the prefabricated pier (1) and the bearing platform (2) can be rapidly connected, the structure meets the industrial building requirement, the construction speed is high, the efficiency is high, and the quality is guaranteed.
本发明是一种新型承台与预制桥墩的连接方法,主要包括承台(2)与预制桥墩(1),承台(2)上表面中央含有若干块并排的钢板(3),并设有钢板预留孔(5);预制桥墩(1)是圆柱式、长方体、正方体中的一种,在预制桥墩(1)的底部含有若干块空心槽(7),大小与承台(2)上的钢板(3)相匹配,并设有桥墩预留孔(4)。本发明的连接方法能够实现预制桥墩(1)和承台(2)之间的快速连接,并且使结构满足工业化的建造要求,施工速度快,效率高,质量有保障。
Novel connecting method for bearing platform and prefabricated pier
一种新型承台与预制桥墩的连接方法
DUAN MAOJUN (author) / ZHU JUNTIAN (author) / SONG CAN (author) / LI ZHUANGZHUANG (author) / WANG FEI (author)
2022-02-25
Patent
Electronic Resource
Chinese
Slot type connecting method for prefabricated pier and bearing platform
European Patent Office | 2022
|Connecting structure of UHPC prefabricated hollow pier and bearing platform
European Patent Office | 2023
|Prefabricated pier column and bearing platform connecting structure and construction method
European Patent Office | 2020
|Prefabricated pier-bearing platform self-sensing connecting structure and implementation method
European Patent Office | 2023
|Quick connecting structure for damping type prefabricated pier and bearing platform
European Patent Office | 2021