A platform for research: civil engineering, architecture and urbanism
Manufacturing process of jacket split type submarine cable pipe
The invention relates to a manufacturing process of a jacket split type submarine cable pipe. The jacket split type submarine cable pipe comprises jacket pile legs, a split type submarine cable pipe, a top platform and suction piles. The split type components are fixed into a whole and welded and fixed through the fixing unit, the first fixing sleeve and the second fixing sleeve, the structural stability and the installation firmness of the device are further enhanced, installation is carried out in a workshop in the first step to the seventh step, and installation is carried out on site in the eighth step to the eleventh step. The problems of water and soil pollution caused by a large amount of welding slag and scrap iron powder generated by field punching, polishing and welding on an installation site and environmental pollution caused by damage to paint on a part in the installation process of the part can be reduced, the environmental safety is maintained, split type manufacturing and installation are adopted, the quality of finished products is guaranteed while the production cost is reduced, a jacket is used for resisting waves and tidal currents of the split type submarine cable pipe, and the service life of the submarine cable pipe is prolonged.
本发明涉及一种导管架分体式海缆管制造工艺,包括导管架桩腿、分体式海缆管、顶部平台和吸力桩;采用分体式部件固定成一整体,且通过固定单元、第一固定套管和第二固定套管进行焊接固定,进一步加强其结构稳定性与安装牢固性,步骤一~七在车间安装,步骤八~十一在现场安装,可减少在安装现场因现场打孔、打磨和焊接产生大量焊渣和铁削粉末,从而造成水土污染,以及部件在安装过程中破坏部件上的油漆造成环境污染的问题,维护环境安全,采用分体式制造与安装,降低生产成本的同时保证成品质量,利用导管架对分体式海缆管进行抗波浪与潮流,增强其使用寿命。
Manufacturing process of jacket split type submarine cable pipe
The invention relates to a manufacturing process of a jacket split type submarine cable pipe. The jacket split type submarine cable pipe comprises jacket pile legs, a split type submarine cable pipe, a top platform and suction piles. The split type components are fixed into a whole and welded and fixed through the fixing unit, the first fixing sleeve and the second fixing sleeve, the structural stability and the installation firmness of the device are further enhanced, installation is carried out in a workshop in the first step to the seventh step, and installation is carried out on site in the eighth step to the eleventh step. The problems of water and soil pollution caused by a large amount of welding slag and scrap iron powder generated by field punching, polishing and welding on an installation site and environmental pollution caused by damage to paint on a part in the installation process of the part can be reduced, the environmental safety is maintained, split type manufacturing and installation are adopted, the quality of finished products is guaranteed while the production cost is reduced, a jacket is used for resisting waves and tidal currents of the split type submarine cable pipe, and the service life of the submarine cable pipe is prolonged.
本发明涉及一种导管架分体式海缆管制造工艺,包括导管架桩腿、分体式海缆管、顶部平台和吸力桩;采用分体式部件固定成一整体,且通过固定单元、第一固定套管和第二固定套管进行焊接固定,进一步加强其结构稳定性与安装牢固性,步骤一~七在车间安装,步骤八~十一在现场安装,可减少在安装现场因现场打孔、打磨和焊接产生大量焊渣和铁削粉末,从而造成水土污染,以及部件在安装过程中破坏部件上的油漆造成环境污染的问题,维护环境安全,采用分体式制造与安装,降低生产成本的同时保证成品质量,利用导管架对分体式海缆管进行抗波浪与潮流,增强其使用寿命。
Manufacturing process of jacket split type submarine cable pipe
一种导管架分体式海缆管制造工艺
GE HUA (author) / JI QIUBING (author) / CAO FENGLI (author) / SHI ZIKUN (author) / YU HANGTIAN (author)
2022-02-25
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Split type pipe pile manufacturing process and construction process
European Patent Office | 2022
|