A platform for research: civil engineering, architecture and urbanism
Karst complex geological pile foundation construction technology and karst complex geological pile foundation
The invention provides a karst complex geological pile foundation construction technology and a karst complex geological pile foundation. The construction technology comprises the following steps that the geological types of multiple pile foundation construction stratums arranged in the extending direction of a pile foundation to be arranged are obtained, and the geological types of at least two pile foundation construction stratums in the multiple pile foundation construction stratums are different; and corresponding pile foundation construction measures are adopted for the multiple pile foundation construction stratums correspondingly. According to the method, the geology of the construction area can be detected and analyzed before pile foundation construction, the parameter information of the multiple different geological layers across which the pile foundation crosses is obtained, and the corresponding pile foundation construction scheme is designed according to the combination of multiple geological types, so that the construction efficiency is improved, and the construction quality is improved.
本申请提供一种岩溶复杂地质桩基施工工艺和岩溶复杂地质桩基,施工工艺包括如下步骤:获取在待设桩基的延伸方向上排布的多个桩基施工地层的地质类型,多个桩基施工地层中至少两个桩基施工地层的地质类型不同;对多个桩基施工地层分别采取对应的桩基施工措施。能够在桩基施工前先对施工区域的地质进行检测分析,先获取桩基所横跨的多个不同地质层的参数信息,根据多种地质类型的组合设计相应的桩基施工方案,从而提高施工效率,提高施工质量。
Karst complex geological pile foundation construction technology and karst complex geological pile foundation
The invention provides a karst complex geological pile foundation construction technology and a karst complex geological pile foundation. The construction technology comprises the following steps that the geological types of multiple pile foundation construction stratums arranged in the extending direction of a pile foundation to be arranged are obtained, and the geological types of at least two pile foundation construction stratums in the multiple pile foundation construction stratums are different; and corresponding pile foundation construction measures are adopted for the multiple pile foundation construction stratums correspondingly. According to the method, the geology of the construction area can be detected and analyzed before pile foundation construction, the parameter information of the multiple different geological layers across which the pile foundation crosses is obtained, and the corresponding pile foundation construction scheme is designed according to the combination of multiple geological types, so that the construction efficiency is improved, and the construction quality is improved.
本申请提供一种岩溶复杂地质桩基施工工艺和岩溶复杂地质桩基,施工工艺包括如下步骤:获取在待设桩基的延伸方向上排布的多个桩基施工地层的地质类型,多个桩基施工地层中至少两个桩基施工地层的地质类型不同;对多个桩基施工地层分别采取对应的桩基施工措施。能够在桩基施工前先对施工区域的地质进行检测分析,先获取桩基所横跨的多个不同地质层的参数信息,根据多种地质类型的组合设计相应的桩基施工方案,从而提高施工效率,提高施工质量。
Karst complex geological pile foundation construction technology and karst complex geological pile foundation
岩溶复杂地质桩基施工工艺和岩溶复杂地质桩基
LIU KE (author) / RYU HOON (author) / ZOU XUNGANG (author)
2022-03-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Complex geological karst hole pile foundation construction process
European Patent Office | 2021
|European Patent Office | 2023
|Karst area pile foundation construction method and karst area pile foundation construction device
European Patent Office | 2022
|Equipment for drilling karst geological pile foundation and construction grouting method thereof
European Patent Office | 2024
|