A platform for research: civil engineering, architecture and urbanism
Cross-Yellow River prestressed corrugated steel web continuous rigid frame bridge beam pouring device
The invention discloses a pouring device for a cross-Yellow River prestressed corrugated steel web continuous rigid frame bridge cross beam, and relates to the technical field of concrete pouring. The pouring device for the cross beam of the Yellow River crossing prestressed corrugated steel web continuous rigid frame bridge comprises a trolley moving on a guide rail, a hanging basket is fixedly installed on the trolley through a hoisting mechanism and a sling, a stirring mechanism and a slurry pump are fixedly installed on the trolley, and a discharging port of the stirring mechanism is communicated with the slurry pump. According to the cross-river prestressed corrugated steel web continuous rigid frame bridge cross beam pouring device, an oil inlet pipe and an oil outlet pipe are connected with a cooling oil circulating pump through hoses, cooling oil can be guided into a vibrator to continuously cool a second motor, and therefore the phenomenon that the second motor is overheated in the shell is avoided; cooling oil can be prevented from being in contact with the eccentric block, so that the cooling oil is prevented from hindering rotation of the eccentric block.
本发明公开了一种跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,涉及混凝土浇筑技术领域。该跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,包括在导轨上移动的小车,所述小车上通过卷扬机构及吊索固定安装有挂篮,所述小车上固定安装有搅拌机构、泥浆泵,所述搅拌机构的出料口与泥浆泵连通。该跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,通过将进油管及出油管通过软管与冷却油循环泵连接,可将冷却油导入振捣器内对第二电机进行持续的冷却降温,从而避免第二电机在壳体内出现过热现象,通过隔板的设置,能够避免冷却油与偏心块接触,以避免了冷却油对偏心块的转动造成阻碍。
Cross-Yellow River prestressed corrugated steel web continuous rigid frame bridge beam pouring device
The invention discloses a pouring device for a cross-Yellow River prestressed corrugated steel web continuous rigid frame bridge cross beam, and relates to the technical field of concrete pouring. The pouring device for the cross beam of the Yellow River crossing prestressed corrugated steel web continuous rigid frame bridge comprises a trolley moving on a guide rail, a hanging basket is fixedly installed on the trolley through a hoisting mechanism and a sling, a stirring mechanism and a slurry pump are fixedly installed on the trolley, and a discharging port of the stirring mechanism is communicated with the slurry pump. According to the cross-river prestressed corrugated steel web continuous rigid frame bridge cross beam pouring device, an oil inlet pipe and an oil outlet pipe are connected with a cooling oil circulating pump through hoses, cooling oil can be guided into a vibrator to continuously cool a second motor, and therefore the phenomenon that the second motor is overheated in the shell is avoided; cooling oil can be prevented from being in contact with the eccentric block, so that the cooling oil is prevented from hindering rotation of the eccentric block.
本发明公开了一种跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,涉及混凝土浇筑技术领域。该跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,包括在导轨上移动的小车,所述小车上通过卷扬机构及吊索固定安装有挂篮,所述小车上固定安装有搅拌机构、泥浆泵,所述搅拌机构的出料口与泥浆泵连通。该跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置,通过将进油管及出油管通过软管与冷却油循环泵连接,可将冷却油导入振捣器内对第二电机进行持续的冷却降温,从而避免第二电机在壳体内出现过热现象,通过隔板的设置,能够避免冷却油与偏心块接触,以避免了冷却油对偏心块的转动造成阻碍。
Cross-Yellow River prestressed corrugated steel web continuous rigid frame bridge beam pouring device
一种跨黄河预应力波形钢腹板连续刚构桥横梁浇筑装置
DONG XINGYU (author) / LI XINWEN (author)
2022-03-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2022
|European Patent Office | 2023
|Lifting hanging basket of corrugated steel web prestressed concrete continuous rigid frame bridge
European Patent Office | 2023
|Corrugated steel web continuous rigid frame bridge construction method
European Patent Office | 2022
|Construction method of continuous beam rigid frame bridge cantilever pouring linear section
European Patent Office | 2024
|