A side plate and a top plate are fixedly connected to form a right-angle component, and the side plate is fixedly connected with a side wall at the bottom of the post-pouring seam; the top plate is attached to the bottom surface of a floor slab on the side edge of the post-pouring joint and is wider than the post-pouring joint; inclined struts are arranged between the top plate and the side plates; the construction method of the prefabricated laminated slab post-pouring gap steel plate blocking mold comprises the specific steps that (1) the side plates of the mold are attached to the side walls, and the bolt holes in the side plates correspond to reserved holes in the side walls; (2) the mold and the side wall are pre-fixed through bolts; 3) adjusting the horizontal position of the mold to make a mold top plate attached to the bottom surface of the floor and located at the bottom of the post-pouring seam, and completely fixing the mold; (4) grouting is conducted from the top gap of the prefabricated floor slab, and the mold is dismantled after concrete is shaped, the gap plugging formwork and the side wall are fixed, and the tedious procedure that when grouting is conducted on the top gap of the prefabricated floor slab, the formwork needs to be erected from the ground, and the mold needs to be repeatedly adjusted is solved.
本发明涉及预制叠合板后浇缝隙钢板封堵模具,侧板与顶板固接为直角构件,侧板与后浇缝底部侧墙固接;顶板与后浇缝侧边的楼板底面相贴,顶板宽度大于后浇缝;顶板与侧板夹角设斜撑;上述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板与侧墙相贴,将侧板上的螺栓孔与侧墙预留孔相对应;2)用螺栓将模具与侧墙预固定;3)调整模具水平位置,使模具顶板与楼板底面相贴且位于后浇缝底部,完全固定模具;4)从预制楼板顶部缝隙处注浆,待混凝土定型后拆除本模具即可,本发明将缝隙封堵模板与侧墙固定,解决了预制楼板顶部缝隙处注浆时需要从地面支模板的要反复调整模具的繁琐工序。
A side plate and a top plate are fixedly connected to form a right-angle component, and the side plate is fixedly connected with a side wall at the bottom of the post-pouring seam; the top plate is attached to the bottom surface of a floor slab on the side edge of the post-pouring joint and is wider than the post-pouring joint; inclined struts are arranged between the top plate and the side plates; the construction method of the prefabricated laminated slab post-pouring gap steel plate blocking mold comprises the specific steps that (1) the side plates of the mold are attached to the side walls, and the bolt holes in the side plates correspond to reserved holes in the side walls; (2) the mold and the side wall are pre-fixed through bolts; 3) adjusting the horizontal position of the mold to make a mold top plate attached to the bottom surface of the floor and located at the bottom of the post-pouring seam, and completely fixing the mold; (4) grouting is conducted from the top gap of the prefabricated floor slab, and the mold is dismantled after concrete is shaped, the gap plugging formwork and the side wall are fixed, and the tedious procedure that when grouting is conducted on the top gap of the prefabricated floor slab, the formwork needs to be erected from the ground, and the mold needs to be repeatedly adjusted is solved.
本发明涉及预制叠合板后浇缝隙钢板封堵模具,侧板与顶板固接为直角构件,侧板与后浇缝底部侧墙固接;顶板与后浇缝侧边的楼板底面相贴,顶板宽度大于后浇缝;顶板与侧板夹角设斜撑;上述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板与侧墙相贴,将侧板上的螺栓孔与侧墙预留孔相对应;2)用螺栓将模具与侧墙预固定;3)调整模具水平位置,使模具顶板与楼板底面相贴且位于后浇缝底部,完全固定模具;4)从预制楼板顶部缝隙处注浆,待混凝土定型后拆除本模具即可,本发明将缝隙封堵模板与侧墙固定,解决了预制楼板顶部缝隙处注浆时需要从地面支模板的要反复调整模具的繁琐工序。
Prefabricated laminated slab post-pouring gap steel plate plugging mold and construction method thereof
预制叠合板后浇缝隙钢板封堵模具及其施工方法
HAO FULI (author)
2022-03-18
Patent
Electronic Resource
Chinese
Laminated slab mold and laminated slab pouring method applying same
European Patent Office | 2022
|Laminated slab mold and laminated slab pouring method applying same
European Patent Office | 2021
|Method for pouring by using prefabricated laminated slab
European Patent Office | 2023
|Steel plate prefabricated concrete hollow laminated slab and construction method thereof
European Patent Office | 2024
|Laminated slab post-pouring joint structure and construction method
European Patent Office | 2022
|