A platform for research: civil engineering, architecture and urbanism
Irregular pile foundation reinforcement cage
According to the technical scheme, the irregular pile foundation reinforcement cage is characterized in that the irregular pile foundation reinforcement cage comprises a plurality of positioning rings and a plurality of connecting steel bars, the connecting steel bars are distributed along the outer contours of the positioning rings at intervals and connected with the positioning rings, and each positioning ring comprises two symmetrically-arranged first arc segments and two connecting segments; the connecting sections are connected between the ends, close to each other, of the two first arc sections, and the maximum distance between the two connecting sections is smaller than the diameter of a circle where the first arc sections are located. The positioning ring is formed by connecting two first arc sections and two connecting sections, and the distance between the two connecting sections is smaller than the diameter of a circle where the first arc sections are located, so that clearance positions are formed in the two sides of the reinforcement cage, in the pouring process, the limiting steel box can be placed in the clearance positions, and after pile foundation pouring is completed, a second-stage groove is formed in the position of the limiting steel box; and in addition, the structure is simple, and machining and forming are easy.
本发明提供一种不规则桩基钢筋笼,其技术方案要点是不规则桩基钢筋笼包括多个定位环和多根连接钢筋,所述连接钢筋沿所述定位环的外轮廓间隔分布并与多个定位环连接,所述定位环包括两个对称设置的第一弧线段和两个连接段,所述连接段连接于两个第一弧线段相互靠近的端部之间,两个所述连接段的最大间距小于所述第一弧线段所在圆的直径。定位环由两个第一弧线段与两个连接段连接形成,两个连接段之间的间距小于第一弧线段所在圆的直径,从而使钢筋笼两侧形成避空位,在浇筑的过程中,避空位可放入限位钢箱,从而在桩基浇筑完成后,于限位钢箱位置处形成二期槽,满足桩基的成型需求,而且此结构简单,易于加工成型。
Irregular pile foundation reinforcement cage
According to the technical scheme, the irregular pile foundation reinforcement cage is characterized in that the irregular pile foundation reinforcement cage comprises a plurality of positioning rings and a plurality of connecting steel bars, the connecting steel bars are distributed along the outer contours of the positioning rings at intervals and connected with the positioning rings, and each positioning ring comprises two symmetrically-arranged first arc segments and two connecting segments; the connecting sections are connected between the ends, close to each other, of the two first arc sections, and the maximum distance between the two connecting sections is smaller than the diameter of a circle where the first arc sections are located. The positioning ring is formed by connecting two first arc sections and two connecting sections, and the distance between the two connecting sections is smaller than the diameter of a circle where the first arc sections are located, so that clearance positions are formed in the two sides of the reinforcement cage, in the pouring process, the limiting steel box can be placed in the clearance positions, and after pile foundation pouring is completed, a second-stage groove is formed in the position of the limiting steel box; and in addition, the structure is simple, and machining and forming are easy.
本发明提供一种不规则桩基钢筋笼,其技术方案要点是不规则桩基钢筋笼包括多个定位环和多根连接钢筋,所述连接钢筋沿所述定位环的外轮廓间隔分布并与多个定位环连接,所述定位环包括两个对称设置的第一弧线段和两个连接段,所述连接段连接于两个第一弧线段相互靠近的端部之间,两个所述连接段的最大间距小于所述第一弧线段所在圆的直径。定位环由两个第一弧线段与两个连接段连接形成,两个连接段之间的间距小于第一弧线段所在圆的直径,从而使钢筋笼两侧形成避空位,在浇筑的过程中,避空位可放入限位钢箱,从而在桩基浇筑完成后,于限位钢箱位置处形成二期槽,满足桩基的成型需求,而且此结构简单,易于加工成型。
Irregular pile foundation reinforcement cage
一种不规则桩基钢筋笼
AN BANG (author) / ZHONG CAN (author) / YUAN HENG (author) / JIANG DONG (author) / HU JIANFEI (author) / ZHANG JINGXIAN (author)
2022-03-25
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Preparation method of pile foundation reinforcement cage
European Patent Office | 2022
|Bridge pile foundation reinforcement cage positioning device
European Patent Office | 2024
|Pile foundation reinforcement cage construction positioning method
European Patent Office | 2021
|