A platform for research: civil engineering, architecture and urbanism
Foundation ring of wind power generation equipment
The invention discloses a wind power generation equipment foundation ring which comprises a foundation ring cylinder body, a first flange, a second flange, a first ring plate, a second ring plate, a third ring plate, a first rib plate, a second rib plate, a third rib plate and a fourth rib plate, the first flange is fixed to the top face of the foundation ring cylinder body, and the second flange is fixed to the bottom face of the foundation ring cylinder body; the first ring plate, the second ring plate and the third ring plate are sequentially arranged on the peripheral face of the foundation ring cylinder in a sleeving mode in the height direction of the foundation ring cylinder, a plurality of first rib plates are arranged on the foundation ring cylinder below the first ring plate, and a plurality of second rib plates are arranged on the foundation ring cylinder between the first ring plate and the second ring plate. A third rib plate is arranged on the foundation ring cylinder between the second ring plate and the third ring plate, a plurality of fourth rib plates are arranged on the peripheral surface of the foundation ring cylinder above the third ring plate, the ring plates and the rib plates form a lattice frame structure on the foundation ring cylinder, and the second ring plate is flush with a reinforced concrete pouring plane. The contact force between the foundation ring and reinforced concrete is enhanced.
本发明公开了一种风力发电设备基础环,包括:基础环筒体、第一法兰、第二法兰、第一环板、第二环板、第三环板、第一筋板、第二筋板、第三筋板和第四筋板,第一法兰固定于基础环筒体的顶面,第二法兰固定在基础环筒体的底面,第一环板、第二环板和第三环板沿基础环筒体的高度方向依次套设于基础环筒体的外周面,第一环板下方的基础环筒体上设置多个第一筋板,第一环板和第二环板之间的基础环筒体上设置多个第二筋板,第二环板和第三环板之间的基础环筒体上设置第三筋板,第三环板上方的基础环筒体的外周面上设置多个第四筋板,环板和筋板在基础环筒体形成格框结构,第二环板与钢筋混凝土浇筑平面齐平。本发明增强基础环与钢筋混凝土的接触力。
Foundation ring of wind power generation equipment
The invention discloses a wind power generation equipment foundation ring which comprises a foundation ring cylinder body, a first flange, a second flange, a first ring plate, a second ring plate, a third ring plate, a first rib plate, a second rib plate, a third rib plate and a fourth rib plate, the first flange is fixed to the top face of the foundation ring cylinder body, and the second flange is fixed to the bottom face of the foundation ring cylinder body; the first ring plate, the second ring plate and the third ring plate are sequentially arranged on the peripheral face of the foundation ring cylinder in a sleeving mode in the height direction of the foundation ring cylinder, a plurality of first rib plates are arranged on the foundation ring cylinder below the first ring plate, and a plurality of second rib plates are arranged on the foundation ring cylinder between the first ring plate and the second ring plate. A third rib plate is arranged on the foundation ring cylinder between the second ring plate and the third ring plate, a plurality of fourth rib plates are arranged on the peripheral surface of the foundation ring cylinder above the third ring plate, the ring plates and the rib plates form a lattice frame structure on the foundation ring cylinder, and the second ring plate is flush with a reinforced concrete pouring plane. The contact force between the foundation ring and reinforced concrete is enhanced.
本发明公开了一种风力发电设备基础环,包括:基础环筒体、第一法兰、第二法兰、第一环板、第二环板、第三环板、第一筋板、第二筋板、第三筋板和第四筋板,第一法兰固定于基础环筒体的顶面,第二法兰固定在基础环筒体的底面,第一环板、第二环板和第三环板沿基础环筒体的高度方向依次套设于基础环筒体的外周面,第一环板下方的基础环筒体上设置多个第一筋板,第一环板和第二环板之间的基础环筒体上设置多个第二筋板,第二环板和第三环板之间的基础环筒体上设置第三筋板,第三环板上方的基础环筒体的外周面上设置多个第四筋板,环板和筋板在基础环筒体形成格框结构,第二环板与钢筋混凝土浇筑平面齐平。本发明增强基础环与钢筋混凝土的接触力。
Foundation ring of wind power generation equipment
风力发电设备基础环
LI RUIBIN (author) / LI YONGLIANG (author) / LIU LIFANG (author) / LI WEI (author)
2022-03-25
Patent
Electronic Resource
Chinese
Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation
European Patent Office | 2015
|European Patent Office | 2015
|Concrete tower drum foundation, foundation construction method and wind power generation equipment
European Patent Office | 2023
|European Patent Office | 2020
|Offshore wind power generation platform foundation structure
European Patent Office | 2024
|