A platform for research: civil engineering, architecture and urbanism
Construction method of movable protective shed during construction of transportation junction station platform steel structure main body
The invention discloses a construction method for a movable protective shed during construction of a transportation junction station platform steel structure body. The construction method comprises the following steps that S1, rails are installed on the two sides of an existing canopy and corrected; s2, the walking mechanism is assembled and fixed on the ground; s3, a stand column is hoisted on the walking mechanism on one side; s4, a stand column is hoisted on the walking mechanism on the other side; s5, surface beams are hoisted on the stand columns on the two sides; s6, roof inclined struts and roof distribution beams are hoisted; s7, a panel is hoisted on the roof to form a protective shed; s8, electrical installation and debugging are carried out in a track running area of the track; and S9, the whole protective shed is hoisted to a traveling rail area, and electricity is switched on. The method has the advantages of flexibility, safety, no influence on the running of the existing subway and capability of improving the construction efficiency.
本发明公开了一种交通枢纽位站台钢结构主体施工时的移动防护棚施工方法,包括以下步骤:S1:在既有雨棚两侧安装轨道并校正;S2:在地面拼装行走机构并固定;S3:在一侧行走机构上吊装立柱;S4:在另一侧行走机构上吊装立柱;S5:在两侧的立柱吊装面梁;S6:吊装屋面斜撑和屋面分配梁;S7:在屋面吊装面板形成防护棚;S8:在轨道的行轨区进行电气安装及调试;S9:将防护棚整个吊装至行轨区并接通电气。具有灵活安全、不影响既有地铁运行、可提高施工效率的优点。
Construction method of movable protective shed during construction of transportation junction station platform steel structure main body
The invention discloses a construction method for a movable protective shed during construction of a transportation junction station platform steel structure body. The construction method comprises the following steps that S1, rails are installed on the two sides of an existing canopy and corrected; s2, the walking mechanism is assembled and fixed on the ground; s3, a stand column is hoisted on the walking mechanism on one side; s4, a stand column is hoisted on the walking mechanism on the other side; s5, surface beams are hoisted on the stand columns on the two sides; s6, roof inclined struts and roof distribution beams are hoisted; s7, a panel is hoisted on the roof to form a protective shed; s8, electrical installation and debugging are carried out in a track running area of the track; and S9, the whole protective shed is hoisted to a traveling rail area, and electricity is switched on. The method has the advantages of flexibility, safety, no influence on the running of the existing subway and capability of improving the construction efficiency.
本发明公开了一种交通枢纽位站台钢结构主体施工时的移动防护棚施工方法,包括以下步骤:S1:在既有雨棚两侧安装轨道并校正;S2:在地面拼装行走机构并固定;S3:在一侧行走机构上吊装立柱;S4:在另一侧行走机构上吊装立柱;S5:在两侧的立柱吊装面梁;S6:吊装屋面斜撑和屋面分配梁;S7:在屋面吊装面板形成防护棚;S8:在轨道的行轨区进行电气安装及调试;S9:将防护棚整个吊装至行轨区并接通电气。具有灵活安全、不影响既有地铁运行、可提高施工效率的优点。
Construction method of movable protective shed during construction of transportation junction station platform steel structure main body
交通枢纽位站台钢结构主体施工时的移动防护棚施工方法
CAO ZHENXING (author) / ZHOU CHEN (author) / ZHOU HAO (author) / LI YANG (author) / LONG GENWANG (author) / XIA ZHENRONG (author)
2022-03-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for platform steel structure main body of transportation junction
European Patent Office | 2022
|European Patent Office | 2020
|Intelligent protective shed for construction site and steel structure of intelligent protective shed
European Patent Office | 2021
|