Construction method of comprehensive pipe gallery and long-section pipe gallery
The invention provides a construction method of a comprehensive pipe gallery and a long-section pipe gallery, and the construction method of the comprehensive pipe gallery comprises the steps that a short-section pipe gallery is prefabricated and machined in a prefabricating area; after the short-section pipe gallery is prefabricated, the short-section pipe gallery is transported from the prefabricating area to the assembling area; after the short section pipe galleries are transported to the assembly area, the target number of short section pipe galleries are connected together in series in the assembly area to form a long section pipe gallery with the target length value, and the target number is larger than 1; and the long-section pipe gallery is hoisted to a target installation position from the assembly area, and the adjacent long-section pipe galleries are assembled. According to the arrangement, by prefabricating the short-section pipe gallery and transporting the short-section pipe gallery, the requirement for transportation conditions is lowered, and the influence on existing traffic is avoided; and the assembled long-section pipe gallery is hoisted to a target installation position, meanwhile, other short-section pipe galleries can be assembled to form a new long-section pipe gallery, and the construction efficiency can be guaranteed.
本发明提供一种综合管廊的施工方法及长节段管廊,其中,综合管廊的施工方法包括在预制区预制加工短节段管廊;预制完成短节段管廊后,将短节段管廊从预制区运输至装配区;将短节段管廊运输至装配区后,在装配区将目标数量的短节段管廊串联连接在一起,以形成具有目标长度值的长节段管廊,目标数量大于1;将长节段管廊从所述装配区吊装至目标安装位,并将相邻所述长节段管廊进行装配。如此设置,通过预制短节段管廊并对短节段管廊进行运输,降低了对运输条件的需求,且避免了对既有交通的影响;将装配好的长节段管廊吊装至目标安装位,同时能够对其它短节段管廊进行组装以形成新的长节段管廊,能够保证施工效率。
Construction method of comprehensive pipe gallery and long-section pipe gallery
The invention provides a construction method of a comprehensive pipe gallery and a long-section pipe gallery, and the construction method of the comprehensive pipe gallery comprises the steps that a short-section pipe gallery is prefabricated and machined in a prefabricating area; after the short-section pipe gallery is prefabricated, the short-section pipe gallery is transported from the prefabricating area to the assembling area; after the short section pipe galleries are transported to the assembly area, the target number of short section pipe galleries are connected together in series in the assembly area to form a long section pipe gallery with the target length value, and the target number is larger than 1; and the long-section pipe gallery is hoisted to a target installation position from the assembly area, and the adjacent long-section pipe galleries are assembled. According to the arrangement, by prefabricating the short-section pipe gallery and transporting the short-section pipe gallery, the requirement for transportation conditions is lowered, and the influence on existing traffic is avoided; and the assembled long-section pipe gallery is hoisted to a target installation position, meanwhile, other short-section pipe galleries can be assembled to form a new long-section pipe gallery, and the construction efficiency can be guaranteed.
本发明提供一种综合管廊的施工方法及长节段管廊,其中,综合管廊的施工方法包括在预制区预制加工短节段管廊;预制完成短节段管廊后,将短节段管廊从预制区运输至装配区;将短节段管廊运输至装配区后,在装配区将目标数量的短节段管廊串联连接在一起,以形成具有目标长度值的长节段管廊,目标数量大于1;将长节段管廊从所述装配区吊装至目标安装位,并将相邻所述长节段管廊进行装配。如此设置,通过预制短节段管廊并对短节段管廊进行运输,降低了对运输条件的需求,且避免了对既有交通的影响;将装配好的长节段管廊吊装至目标安装位,同时能够对其它短节段管廊进行组装以形成新的长节段管廊,能够保证施工效率。
Construction method of comprehensive pipe gallery and long-section pipe gallery
综合管廊的施工方法及长节段管廊
LU ZHIQIANG (author) / ZHANG LIBIN (author) / WU LING (author) / SHAN HONGWEI (author) / ZHU LI (author)
2022-03-29
Patent
Electronic Resource
Chinese