Gallery lifting platform, prefabricated pipe gallery assembling system and prefabricated pipe gallery construction technology
The invention provides a gallery lifting platform, a prefabricated pipe gallery assembling system and a prefabricated pipe gallery construction technology. The gallery lifting platform comprises a supporting platform and a supporting column device. And the supporting platform is in lap joint with the top of the foundation pit in the width direction of the foundation pit, is used for transporting the pipe gallery sections by the gallery transporting vehicle and extends in the length direction of the foundation pit. The strut device is arranged in the height direction of the foundation pit, one end of the strut device is connected with the supporting platform, and the other end abuts against the bottom of the foundation pit. By means of the arrangement, the corridor lifting platform can be directly erected in the foundation pit according to the pipe corridor installation requirements of all stages so that a corridor carrying vehicle can carry the corridor. And when the next stage of pipe gallery installation is started, the gallery lifting platform can be directly transferred. Therefore, in the whole-line construction process of the pipe gallery sections, foundation pit excavation is achieved in place at a time, measures such as platform soil body reserving, platform soil body reinforcing and platform cast-in-place in the later period are not needed, construction is rapid and convenient, the construction period is shortened, and the construction progress is accelerated.
本发明提供一种提廊平台、预制管廊装配系统及预制管廊施工工艺,包括支撑平台和支柱装置。支撑平台沿基坑的宽度方向搭接在基坑的顶部,用于供运廊车转运管廊节段,且支撑平台沿基坑的长度方向延伸。支柱装置沿基坑的高度方向设置,其一端与支撑平台相连接、另一端与基坑的底部相抵接。如此设置,可根据各阶段管廊安装需求,通过在基坑中直接搭设提廊平台,以供运廊车运廊。待进入下一阶段管廊安装时,可直接将提廊平台进行转移。从而在管廊节段全线施工过程中,使得基坑开挖实现一次到位,无需预留平台土体、对平台土体进行加固及后期进行现浇平台等措施,施工快速便捷,缩短施工工期,加快施工进程。
Gallery lifting platform, prefabricated pipe gallery assembling system and prefabricated pipe gallery construction technology
The invention provides a gallery lifting platform, a prefabricated pipe gallery assembling system and a prefabricated pipe gallery construction technology. The gallery lifting platform comprises a supporting platform and a supporting column device. And the supporting platform is in lap joint with the top of the foundation pit in the width direction of the foundation pit, is used for transporting the pipe gallery sections by the gallery transporting vehicle and extends in the length direction of the foundation pit. The strut device is arranged in the height direction of the foundation pit, one end of the strut device is connected with the supporting platform, and the other end abuts against the bottom of the foundation pit. By means of the arrangement, the corridor lifting platform can be directly erected in the foundation pit according to the pipe corridor installation requirements of all stages so that a corridor carrying vehicle can carry the corridor. And when the next stage of pipe gallery installation is started, the gallery lifting platform can be directly transferred. Therefore, in the whole-line construction process of the pipe gallery sections, foundation pit excavation is achieved in place at a time, measures such as platform soil body reserving, platform soil body reinforcing and platform cast-in-place in the later period are not needed, construction is rapid and convenient, the construction period is shortened, and the construction progress is accelerated.
本发明提供一种提廊平台、预制管廊装配系统及预制管廊施工工艺,包括支撑平台和支柱装置。支撑平台沿基坑的宽度方向搭接在基坑的顶部,用于供运廊车转运管廊节段,且支撑平台沿基坑的长度方向延伸。支柱装置沿基坑的高度方向设置,其一端与支撑平台相连接、另一端与基坑的底部相抵接。如此设置,可根据各阶段管廊安装需求,通过在基坑中直接搭设提廊平台,以供运廊车运廊。待进入下一阶段管廊安装时,可直接将提廊平台进行转移。从而在管廊节段全线施工过程中,使得基坑开挖实现一次到位,无需预留平台土体、对平台土体进行加固及后期进行现浇平台等措施,施工快速便捷,缩短施工工期,加快施工进程。
Gallery lifting platform, prefabricated pipe gallery assembling system and prefabricated pipe gallery construction technology
提廊平台、预制管廊装配系统及预制管廊施工工艺
ZHU LI (author) / XIAN JIANPING (author) / WEI FUXIANG (author) / SHAN HONGWEI (author) / MA HUABING (author)
2022-03-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
European Patent Office | 2016
|