Production process of prefabricated steel structure exterior wall cladding
The invention relates to a production process of a prefabricated steel structure exterior wall cladding. A connecting device; a pouring device; the production method of the prefabricated steel structure exterior wall cladding comprises the following steps that firstly, the inner leaf reinforcing mesh is bundled; step 2, mounting a tie piece; step 3, pouring the inner acanthus; step 4, performing primary vibration on a vibration table; 5, laying a thermal insulation layer; sixthly, outer leaf reinforcing mesh pieces are bundled; step 7, fixing the thermal insulation layer; 8, pouring the outer acanthus; ninthly, vibrating the vibrating table for the second time; the technical problems that hollowing and insufficient thickness of a protective layer are easily caused due to the fact that a heat preservation layer is large in size, large in surface area, light in weight and unreasonable in construction technology are solved.
本发明涉及一种预制钢结构外墙挂板生产工艺,包括:振动装置;连接装置;浇筑装置;该预制钢结构外墙挂板生产步骤如下:步骤一,内叶钢筋网片捆扎;步骤二,拉结件安装;步骤三,内叶板浇筑;步骤四,振动台一次振捣;步骤五,敷设保温层;步骤六,外叶钢筋网片捆扎;步骤七,保温层固定;步骤八,外叶板浇筑;步骤九,振动台二次振捣;本发明解决了由于保温层体积大、表面积大、重量轻,施工工艺不合理极易造成空鼓和保护层厚度不足的技术问题。
Production process of prefabricated steel structure exterior wall cladding
The invention relates to a production process of a prefabricated steel structure exterior wall cladding. A connecting device; a pouring device; the production method of the prefabricated steel structure exterior wall cladding comprises the following steps that firstly, the inner leaf reinforcing mesh is bundled; step 2, mounting a tie piece; step 3, pouring the inner acanthus; step 4, performing primary vibration on a vibration table; 5, laying a thermal insulation layer; sixthly, outer leaf reinforcing mesh pieces are bundled; step 7, fixing the thermal insulation layer; 8, pouring the outer acanthus; ninthly, vibrating the vibrating table for the second time; the technical problems that hollowing and insufficient thickness of a protective layer are easily caused due to the fact that a heat preservation layer is large in size, large in surface area, light in weight and unreasonable in construction technology are solved.
本发明涉及一种预制钢结构外墙挂板生产工艺,包括:振动装置;连接装置;浇筑装置;该预制钢结构外墙挂板生产步骤如下:步骤一,内叶钢筋网片捆扎;步骤二,拉结件安装;步骤三,内叶板浇筑;步骤四,振动台一次振捣;步骤五,敷设保温层;步骤六,外叶钢筋网片捆扎;步骤七,保温层固定;步骤八,外叶板浇筑;步骤九,振动台二次振捣;本发明解决了由于保温层体积大、表面积大、重量轻,施工工艺不合理极易造成空鼓和保护层厚度不足的技术问题。
Production process of prefabricated steel structure exterior wall cladding
一种预制钢结构外墙挂板生产工艺
HUANG ZHEN (author) / YAO CHUANFU (author) / PAN RUYI (author)
2022-04-05
Patent
Electronic Resource
Chinese
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Fine adjustment connecting device for prefabricated exterior wall cladding
European Patent Office | 2024
|Prefabricated concrete exterior wall cladding decorative layer mixing method
European Patent Office | 2021
|Prefabricated fair-faced concrete exterior wall cladding mounting equipment and method
European Patent Office | 2023
|European Patent Office | 2015
|