A platform for research: civil engineering, architecture and urbanism
Urban road reconstruction method and structure jointly built with anti-flood wall and rear berm
The invention discloses a reconstruction method for an urban road jointly built with a flood wall and a rear berm and a road structure. Filling soil of the rear berm of a local road section is excavated, and after the filling soil of the rear berm is excavated, a vertical wall of the flood wall and a thick heel slab are reinforced; then, cement-soil mixing piles are arranged on the outer sides of the wall heels; a road surface is newly built on the anti-flood wall heel slab reinforcing part and the cement-soil mixing piles; according to the method, the Binjiang road is widened, the width requirement for reconstruction and improvement of the urban Binjiang road is met, and the complete function and quality of the Binjiang road are guaranteed compared with local non-motorized vehicle lane canceling or sidewalk width compressing.
本发明公开一种与防洪墙及后戗台合建式城市道路改造方法及道路结构,本发明通过将局部路段的后戗台的填土挖除,后戗台的填土挖除后再对防洪墙立壁及厚踵板进行加固;然后在墙踵外侧设置水泥土搅拌桩;在防洪墙后踵板加固部和水泥土搅拌桩之上新建路面;本发明扩宽了滨江道路,满足了城市滨江道路改造提升的宽度要求,相对于局部取消非机动车道或压缩人行道宽度,保证了滨江道路完整的功能和品质。
Urban road reconstruction method and structure jointly built with anti-flood wall and rear berm
The invention discloses a reconstruction method for an urban road jointly built with a flood wall and a rear berm and a road structure. Filling soil of the rear berm of a local road section is excavated, and after the filling soil of the rear berm is excavated, a vertical wall of the flood wall and a thick heel slab are reinforced; then, cement-soil mixing piles are arranged on the outer sides of the wall heels; a road surface is newly built on the anti-flood wall heel slab reinforcing part and the cement-soil mixing piles; according to the method, the Binjiang road is widened, the width requirement for reconstruction and improvement of the urban Binjiang road is met, and the complete function and quality of the Binjiang road are guaranteed compared with local non-motorized vehicle lane canceling or sidewalk width compressing.
本发明公开一种与防洪墙及后戗台合建式城市道路改造方法及道路结构,本发明通过将局部路段的后戗台的填土挖除,后戗台的填土挖除后再对防洪墙立壁及厚踵板进行加固;然后在墙踵外侧设置水泥土搅拌桩;在防洪墙后踵板加固部和水泥土搅拌桩之上新建路面;本发明扩宽了滨江道路,满足了城市滨江道路改造提升的宽度要求,相对于局部取消非机动车道或压缩人行道宽度,保证了滨江道路完整的功能和品质。
Urban road reconstruction method and structure jointly built with anti-flood wall and rear berm
一种与防洪墙及后戗台合建式城市道路改造方法及结构
YIN ZUCHAO (author) / JIA RUIYU (author) / YIN WENFENG (author) / XIE YIHONG (author) / WANG PENGFU (author) / ZHENG LU (author)
2022-04-08
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2022
|