A platform for research: civil engineering, architecture and urbanism
Double-column formwork erecting system at expansion joint and construction method of double-column formwork erecting system
The invention discloses a double-column formwork system at an expansion joint and a construction method thereof, and the double-column formwork system at the expansion joint is used for building a first column and a second column formed on the two sides of the expansion joint; the system comprises a mirror surface template, and a plurality of square and round buckles, a plurality of tension stabilizing assemblies and a plurality of support stabilizing assemblies which are arranged on the outer surface of the mirror surface template, the mirror surface formwork is arranged on the side, away from the first stand column, of the expansion joint, the mirror surface formwork is in a hollow barrel shape, and the second stand column is poured into the mirror surface formwork. The first stand column and the second stand column are poured twice, and the square and round buckles, the tension stabilizing assemblies and the supporting stabilizing assemblies are matched with one another, so that the shape of the mirror surface formwork in the second pouring process is stable, the shape of an expansion joint between the two columns is regular after the second stand column is formed, and the second stand column and the first stand column are kept parallel; and the repairing process is omitted, and the construction efficiency is improved.
本发明公开了一种伸缩缝处双柱支模系统及其施工方法,其中,所述伸缩缝处双柱支模系统用于建造伸缩缝两侧形成的第一立柱和第二立柱;所述系统包括镜面模板,以及设置于所述镜面模板的外表面上的多个方圆扣、多个拉力稳定组件和多个支撑稳定组件;所述镜面模板设于所述伸缩缝背离所述第一立柱的一侧,所述镜面模板的形状为中空的筒状,内部用于浇筑所述第二立柱。本申请中分两次浇筑第一立柱和第二立柱,并且通过方圆扣、拉力稳定组件和支撑稳定组件的相互配合,使第二次浇筑过程中镜面模板的形状稳定,第二立柱成型后两柱之间的伸缩缝形状规则,第二立柱与第一立柱保持平行,省去修补的流程,提高了建造效率。
Double-column formwork erecting system at expansion joint and construction method of double-column formwork erecting system
The invention discloses a double-column formwork system at an expansion joint and a construction method thereof, and the double-column formwork system at the expansion joint is used for building a first column and a second column formed on the two sides of the expansion joint; the system comprises a mirror surface template, and a plurality of square and round buckles, a plurality of tension stabilizing assemblies and a plurality of support stabilizing assemblies which are arranged on the outer surface of the mirror surface template, the mirror surface formwork is arranged on the side, away from the first stand column, of the expansion joint, the mirror surface formwork is in a hollow barrel shape, and the second stand column is poured into the mirror surface formwork. The first stand column and the second stand column are poured twice, and the square and round buckles, the tension stabilizing assemblies and the supporting stabilizing assemblies are matched with one another, so that the shape of the mirror surface formwork in the second pouring process is stable, the shape of an expansion joint between the two columns is regular after the second stand column is formed, and the second stand column and the first stand column are kept parallel; and the repairing process is omitted, and the construction efficiency is improved.
本发明公开了一种伸缩缝处双柱支模系统及其施工方法,其中,所述伸缩缝处双柱支模系统用于建造伸缩缝两侧形成的第一立柱和第二立柱;所述系统包括镜面模板,以及设置于所述镜面模板的外表面上的多个方圆扣、多个拉力稳定组件和多个支撑稳定组件;所述镜面模板设于所述伸缩缝背离所述第一立柱的一侧,所述镜面模板的形状为中空的筒状,内部用于浇筑所述第二立柱。本申请中分两次浇筑第一立柱和第二立柱,并且通过方圆扣、拉力稳定组件和支撑稳定组件的相互配合,使第二次浇筑过程中镜面模板的形状稳定,第二立柱成型后两柱之间的伸缩缝形状规则,第二立柱与第一立柱保持平行,省去修补的流程,提高了建造效率。
Double-column formwork erecting system at expansion joint and construction method of double-column formwork erecting system
一种伸缩缝处双柱支模系统及其施工方法
HE WENMIN (author) / ZHOU XIANGMING (author) / WANG HUA (author) / SU GUOHUO (author) / LI GUANGCAN (author) / CAO ZHEN (author)
2022-04-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|Building formwork erecting system and formwork erecting method
European Patent Office | 2023
|Formwork erecting construction method for closed constructional column
European Patent Office | 2023
|Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|