Integral pouring and one-time forming construction process for house building
According to the house building integral pouring one-time forming construction technology, a supporting bottom plate is included, first side plates are arranged on the front face and the back face of the top of the supporting bottom plate correspondingly, and second side plates are arranged on the two sides of the top of the supporting bottom plate and located between the first side plates correspondingly; grooves are formed in the two sides of the first side plate and the front face and the back face of the second side plate. Through cooperation of the supporting bottom plate, the first side plate, the second side plate, the groove, the sealing layer, the inserting plate, the fixing plate, transverse steel bars, longitudinal steel bars, fixing rings, limiting rings, a connecting rod, a supporting column, a supporting plate, a first reinforcing rod, a mounting bottom plate, a second reinforcing rod, a connecting fixing rod, an inclined rod and a cross-shaped clamping sleeve, the purpose of integral casting forming of a house building is achieved; and meanwhile, the problems that the house building efficiency is reduced and the labor intensity of personnel is improved due to the fact that the existing house building is generally poured in batches and does not have the function of integral one-time pouring molding during concrete pouring are solved.
本发明公开了一种房屋建筑整体浇注一次成型施工工艺,包括支撑底板,支撑底板顶部的正面和背面均设置有第一侧板,支撑底板顶部的两侧且位于第一侧板之间均设置有第二侧板,第一侧板的两侧与第二侧板的正面和背面均开设有凹槽。本发明通过设置支撑底板、第一侧板、第二侧板、凹槽、密封层、插板、固定板、横向钢筋、纵向钢筋、固定环、限位环、连接杆、支撑柱、支撑板、第一加固杆、安装底板、第二加固杆、连接固定杆、斜杆和十字卡套之间配合,实现房屋建筑整体浇注成型的目的,同时解决了现有房屋建筑在混凝土浇注时,一般分批浇注,不具备整体一次浇注成型的功能,导致房屋建造效率降低,提高人员劳动强度的问题。
Integral pouring and one-time forming construction process for house building
According to the house building integral pouring one-time forming construction technology, a supporting bottom plate is included, first side plates are arranged on the front face and the back face of the top of the supporting bottom plate correspondingly, and second side plates are arranged on the two sides of the top of the supporting bottom plate and located between the first side plates correspondingly; grooves are formed in the two sides of the first side plate and the front face and the back face of the second side plate. Through cooperation of the supporting bottom plate, the first side plate, the second side plate, the groove, the sealing layer, the inserting plate, the fixing plate, transverse steel bars, longitudinal steel bars, fixing rings, limiting rings, a connecting rod, a supporting column, a supporting plate, a first reinforcing rod, a mounting bottom plate, a second reinforcing rod, a connecting fixing rod, an inclined rod and a cross-shaped clamping sleeve, the purpose of integral casting forming of a house building is achieved; and meanwhile, the problems that the house building efficiency is reduced and the labor intensity of personnel is improved due to the fact that the existing house building is generally poured in batches and does not have the function of integral one-time pouring molding during concrete pouring are solved.
本发明公开了一种房屋建筑整体浇注一次成型施工工艺,包括支撑底板,支撑底板顶部的正面和背面均设置有第一侧板,支撑底板顶部的两侧且位于第一侧板之间均设置有第二侧板,第一侧板的两侧与第二侧板的正面和背面均开设有凹槽。本发明通过设置支撑底板、第一侧板、第二侧板、凹槽、密封层、插板、固定板、横向钢筋、纵向钢筋、固定环、限位环、连接杆、支撑柱、支撑板、第一加固杆、安装底板、第二加固杆、连接固定杆、斜杆和十字卡套之间配合,实现房屋建筑整体浇注成型的目的,同时解决了现有房屋建筑在混凝土浇注时,一般分批浇注,不具备整体一次浇注成型的功能,导致房屋建造效率降低,提高人员劳动强度的问题。
Integral pouring and one-time forming construction process for house building
一种房屋建筑整体浇注一次成型施工工艺
SONG JIANNA (author)
2022-05-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
House building integral pouring and one-time forming construction technology
European Patent Office | 2021
|Integrated pouring based house building construction process
European Patent Office | 2021
|Construction method for integrally forming building house through secondary pouring
European Patent Office | 2023
|