A platform for research: civil engineering, architecture and urbanism
Construction method for integrally forming building house through secondary pouring
The invention provides a construction method for integrally forming a building house through secondary pouring, and relates to the technical field of building house construction. The construction method of the building house integrally formed through secondary pouring comprises the following steps of 1, construction of the building house, the method comprises the following steps: 1, designing a drawing; a drawing is customized according to practical requirements; secondly, materials are added for first-time pouring; pouring the foundation to enhance the stability of the foundation; 3, ditching is carried out for water delivery; the drainage ditches are formed in the two sides of the foundation respectively, smooth drainage is guaranteed, and rainwater is prevented from soaking the foundation. The building of the house is preliminarily stabilized through first pouring, then the house is integrally formed through second pouring, displacement deformation and anti-seismic damage of the wall structure are effectively restrained, the overall stability of the wall structure is guaranteed, and the construction efficiency is improved. And the high compressive strength is further achieved by coating the reinforcing steel bar columns, the coagulator and the gap with the filler.
本发明提供一种通过二次浇注一体化成型的建筑房屋施工方法,涉及建筑房屋施工技术领域。该通过二次浇注一体化成型的建筑房屋施工方法,包括以下步骤;步骤一、进行图纸的设计;根据实用的需求进行定制图纸;步骤二、添加材料进行第一次浇筑;对地基进行浇筑加强地基的稳定性;步骤三、并且进行开沟进行输水;在地基两侧各开设一条排水沟,保证排水通畅,避免雨水浸泡地基。通过第一浇筑将房屋的建筑从而得到初步的稳定的效果,再通过第二次浇筑从而得到使房屋一体成型,有效约束了墙体结构的移位变形和抗震破坏,保证了墙体结构的整体稳定性,并且通过钢筋柱、凝固剂和缝隙处涂覆填充剂进而进一步的达到了抗压强度高。
Construction method for integrally forming building house through secondary pouring
The invention provides a construction method for integrally forming a building house through secondary pouring, and relates to the technical field of building house construction. The construction method of the building house integrally formed through secondary pouring comprises the following steps of 1, construction of the building house, the method comprises the following steps: 1, designing a drawing; a drawing is customized according to practical requirements; secondly, materials are added for first-time pouring; pouring the foundation to enhance the stability of the foundation; 3, ditching is carried out for water delivery; the drainage ditches are formed in the two sides of the foundation respectively, smooth drainage is guaranteed, and rainwater is prevented from soaking the foundation. The building of the house is preliminarily stabilized through first pouring, then the house is integrally formed through second pouring, displacement deformation and anti-seismic damage of the wall structure are effectively restrained, the overall stability of the wall structure is guaranteed, and the construction efficiency is improved. And the high compressive strength is further achieved by coating the reinforcing steel bar columns, the coagulator and the gap with the filler.
本发明提供一种通过二次浇注一体化成型的建筑房屋施工方法,涉及建筑房屋施工技术领域。该通过二次浇注一体化成型的建筑房屋施工方法,包括以下步骤;步骤一、进行图纸的设计;根据实用的需求进行定制图纸;步骤二、添加材料进行第一次浇筑;对地基进行浇筑加强地基的稳定性;步骤三、并且进行开沟进行输水;在地基两侧各开设一条排水沟,保证排水通畅,避免雨水浸泡地基。通过第一浇筑将房屋的建筑从而得到初步的稳定的效果,再通过第二次浇筑从而得到使房屋一体成型,有效约束了墙体结构的移位变形和抗震破坏,保证了墙体结构的整体稳定性,并且通过钢筋柱、凝固剂和缝隙处涂覆填充剂进而进一步的达到了抗压强度高。
Construction method for integrally forming building house through secondary pouring
一种通过二次浇注一体化成型的建筑房屋施工方法
ZHANG GUODONG (author) / LIU YUEAI (author) / LIU LIANXUAN (author)
2023-07-04
Patent
Electronic Resource
Chinese
Construction method for integrally-formed building house
European Patent Office | 2024
|Construction method for integrally pouring and forming side wall and upwarp bridging piece
European Patent Office | 2024
|