A platform for research: civil engineering, architecture and urbanism
Steel column mounting method
The invention relates to a steel column mounting method which comprises the following steps: S1, assembling a steel column unit: firstly, assembling and manufacturing the steel column unit, respectively mounting correction plates at two ends of the steel column unit, and extending the correction plates out of the end part of the steel column unit; s2, steel column units are installed, specifically, a first steel column unit is installed firstly, and the first steel column unit is connected with a pre-buried bolt; then a second steel column unit is installed, the operation platform is arranged on the second steel column unit in a sleeving mode, the second steel column unit is aligned with the first steel column unit, the second steel column unit is lowered, the second steel column unit is attached to the correction plate on the first steel column unit, and a correction groove is formed in the inner wall of the operation platform; the correction grooves are clamped into the two attached correction plates, and the first steel column unit and the second steel column unit are corrected; and then the remaining steel column units are sequentially installed. The operation platform has the effect of improving the problem of tedious erection of the operation platform.
本申请涉及一种钢柱安装方法,包括以下步骤:S1、拼装钢柱单元:首先拼装制作钢柱单元,并且在钢柱单元的两端分别安装校正板,且校正板延伸出钢柱单元的端部;S2、安装钢柱单元:首先安装第一根钢柱单元,将第一根钢柱单元与预埋的螺栓连接;然后安装第二根钢柱单元,使操作平台套设在第二根钢柱单元上,将第二根钢柱单元与第一根钢柱单元对正,下放第二根钢柱单元,且使第二根钢柱单元与第一根钢柱单元上的校正板贴合,在操作平台内壁上开设有校正槽,使校正槽卡入到两块贴合的校正板上,将第一根钢柱单元与第二根钢柱单元校正;然后依次安装剩余钢柱单元。本申请具有改善操作平台搭设繁琐问题的效果。
Steel column mounting method
The invention relates to a steel column mounting method which comprises the following steps: S1, assembling a steel column unit: firstly, assembling and manufacturing the steel column unit, respectively mounting correction plates at two ends of the steel column unit, and extending the correction plates out of the end part of the steel column unit; s2, steel column units are installed, specifically, a first steel column unit is installed firstly, and the first steel column unit is connected with a pre-buried bolt; then a second steel column unit is installed, the operation platform is arranged on the second steel column unit in a sleeving mode, the second steel column unit is aligned with the first steel column unit, the second steel column unit is lowered, the second steel column unit is attached to the correction plate on the first steel column unit, and a correction groove is formed in the inner wall of the operation platform; the correction grooves are clamped into the two attached correction plates, and the first steel column unit and the second steel column unit are corrected; and then the remaining steel column units are sequentially installed. The operation platform has the effect of improving the problem of tedious erection of the operation platform.
本申请涉及一种钢柱安装方法,包括以下步骤:S1、拼装钢柱单元:首先拼装制作钢柱单元,并且在钢柱单元的两端分别安装校正板,且校正板延伸出钢柱单元的端部;S2、安装钢柱单元:首先安装第一根钢柱单元,将第一根钢柱单元与预埋的螺栓连接;然后安装第二根钢柱单元,使操作平台套设在第二根钢柱单元上,将第二根钢柱单元与第一根钢柱单元对正,下放第二根钢柱单元,且使第二根钢柱单元与第一根钢柱单元上的校正板贴合,在操作平台内壁上开设有校正槽,使校正槽卡入到两块贴合的校正板上,将第一根钢柱单元与第二根钢柱单元校正;然后依次安装剩余钢柱单元。本申请具有改善操作平台搭设繁琐问题的效果。
Steel column mounting method
一种钢柱安装方法
WANG YIMIN (author) / SANG XIUXING (author) / HONG BIAO (author) / DU QIN (author) / BAI JINHE (author) / LIU BOYOU (author) / ZHU YUPENG (author) / YANG SHUO (author)
2022-05-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Steel column mounting operation platform and mounting method thereof
European Patent Office | 2015
|