A platform for research: civil engineering, architecture and urbanism
High-safety steel cable fixing part for bridge building engineering construction
The invention provides a high-safety steel cable fixing part for bridge building engineering construction, and relates to the technical field of building construction. The high-safety steel cable fixing part for bridge building engineering construction comprises a steel cable end, a protective cylinder and a buffer ring, the steel cable end is fixedly connected to the bottom end of a steel cable body, a first concrete pouring layer is arranged between an isolation cover and the steel cable end and between the isolation cover and a bridge wing plate, and a second concrete pouring layer is arranged on the outer side of the steel cable body. A plurality of buffer rod assemblies are evenly arranged between the buffer cylinder and the mounting base, a plurality of buffer plate assemblies are evenly arranged between the protective cylinder and the buffer cylinder, a plurality of air springs are evenly and fixedly connected between the buffer ring and the bridge wing plate, and the telescopic pipe is fixedly connected to the rear end of the front end cover. The steel cable fixing piece can buffer and redirection external force and avoid stress concentration, has the self-detection characteristic, is high in safety performance and saves manpower.
本发明提供一种用于桥梁建筑工程施工的高安全性钢索固定件,涉及建筑施工技术领域。该用于桥梁建筑工程施工的高安全性钢索固定件,包括钢索端头、防护筒和缓冲环,所述钢索端头固定连接在钢索本体的底端,所述隔离罩与钢索端头和桥梁翼板之间设置有第一混凝土浇筑层,所述钢索本体外侧设置有第二混凝土浇筑层,所述缓冲筒与安装座之间均匀设置有若干个缓冲杆组件,所述防护筒与缓冲筒之间均匀设置有若干个缓冲板组件,所述缓冲环与桥梁翼板之间均匀固定连接有若干个空气弹簧,所述伸缩管固定连接在前端盖的后端。钢索固定件能对外力进行缓冲和改向并避免应力集中,具备自检测特性,安全性能高,节约人力。
High-safety steel cable fixing part for bridge building engineering construction
The invention provides a high-safety steel cable fixing part for bridge building engineering construction, and relates to the technical field of building construction. The high-safety steel cable fixing part for bridge building engineering construction comprises a steel cable end, a protective cylinder and a buffer ring, the steel cable end is fixedly connected to the bottom end of a steel cable body, a first concrete pouring layer is arranged between an isolation cover and the steel cable end and between the isolation cover and a bridge wing plate, and a second concrete pouring layer is arranged on the outer side of the steel cable body. A plurality of buffer rod assemblies are evenly arranged between the buffer cylinder and the mounting base, a plurality of buffer plate assemblies are evenly arranged between the protective cylinder and the buffer cylinder, a plurality of air springs are evenly and fixedly connected between the buffer ring and the bridge wing plate, and the telescopic pipe is fixedly connected to the rear end of the front end cover. The steel cable fixing piece can buffer and redirection external force and avoid stress concentration, has the self-detection characteristic, is high in safety performance and saves manpower.
本发明提供一种用于桥梁建筑工程施工的高安全性钢索固定件,涉及建筑施工技术领域。该用于桥梁建筑工程施工的高安全性钢索固定件,包括钢索端头、防护筒和缓冲环,所述钢索端头固定连接在钢索本体的底端,所述隔离罩与钢索端头和桥梁翼板之间设置有第一混凝土浇筑层,所述钢索本体外侧设置有第二混凝土浇筑层,所述缓冲筒与安装座之间均匀设置有若干个缓冲杆组件,所述防护筒与缓冲筒之间均匀设置有若干个缓冲板组件,所述缓冲环与桥梁翼板之间均匀固定连接有若干个空气弹簧,所述伸缩管固定连接在前端盖的后端。钢索固定件能对外力进行缓冲和改向并避免应力集中,具备自检测特性,安全性能高,节约人力。
High-safety steel cable fixing part for bridge building engineering construction
一种用于桥梁建筑工程施工的高安全性钢索固定件
JIAO PENGYI (author)
2022-05-10
Patent
Electronic Resource
Chinese
Construction equipment for replacing steel cable of steel cable bridge
European Patent Office | 2022
|Bridge vase pier steel formwork fixing construction method
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2021
|