A platform for research: civil engineering, architecture and urbanism
Submarine cable laying device for ocean engineering construction
The submarine cable laying device for ocean engineering construction comprises a bottom plate and a laying plate, the laying plate is arranged at the top of the bottom plate, a gradienter is horizontally arranged in the middle of the front face of the bottom plate and the middle of the front face of the laying plate, a mounting box and a moving mechanism are arranged on the two transverse sides of the top of the laying plate respectively, and a first motor is fixedly arranged at one end of the laying plate; the output end of the first motor is in transmission connection with a spiral roller; the moving mechanism comprises a transverse moving set and a vertical moving set, a connecting block is movably arranged in the middle of the vertical moving set, a groove is formed in the top of the connecting block, and a laying part is fixedly arranged in the middle of the groove. According to the invention, after the whole equipment enters water, the two groups of spiral rollers arranged at the front end of the laying plate and the bottom plate are in contact with the seabed ground, the spiral rollers can be driven by the first motor to complete rotation, and after the spiral rollers are drilled into the seabed, the whole stability is further guaranteed, the effect of rapid entering into the sea in the later period is completed, and the efficiency of cable laying in the later period is improved.
本发明公开了一种海洋工程施工用海底线缆铺设装置,包括底板、铺设板,底板的顶部设置有铺设板,底板与铺设板的正面中部水平设置有水平仪,铺设板的顶部横向两侧分别设置有安装箱与移动机构,铺设板的一端固定设置有第一电机,第一电机的输出端传动连接有螺旋辊;移动机构包括横向移动组与竖向移动组,竖向移动组的中部活动设置连接块,连接块的顶部设置有凹槽,凹槽的中部固定设置有铺设件。本发明中,整体设备入水后,位于铺设板前端所设有两组螺旋辊,底板处与海底地面接触后,可通过第一电机驱动螺旋辊完成转动,螺旋辊钻入海底内部之后,进而保障整体的稳定性,且完成了后期的快速入海的效果,提高后期线缆铺设的效率。
Submarine cable laying device for ocean engineering construction
The submarine cable laying device for ocean engineering construction comprises a bottom plate and a laying plate, the laying plate is arranged at the top of the bottom plate, a gradienter is horizontally arranged in the middle of the front face of the bottom plate and the middle of the front face of the laying plate, a mounting box and a moving mechanism are arranged on the two transverse sides of the top of the laying plate respectively, and a first motor is fixedly arranged at one end of the laying plate; the output end of the first motor is in transmission connection with a spiral roller; the moving mechanism comprises a transverse moving set and a vertical moving set, a connecting block is movably arranged in the middle of the vertical moving set, a groove is formed in the top of the connecting block, and a laying part is fixedly arranged in the middle of the groove. According to the invention, after the whole equipment enters water, the two groups of spiral rollers arranged at the front end of the laying plate and the bottom plate are in contact with the seabed ground, the spiral rollers can be driven by the first motor to complete rotation, and after the spiral rollers are drilled into the seabed, the whole stability is further guaranteed, the effect of rapid entering into the sea in the later period is completed, and the efficiency of cable laying in the later period is improved.
本发明公开了一种海洋工程施工用海底线缆铺设装置,包括底板、铺设板,底板的顶部设置有铺设板,底板与铺设板的正面中部水平设置有水平仪,铺设板的顶部横向两侧分别设置有安装箱与移动机构,铺设板的一端固定设置有第一电机,第一电机的输出端传动连接有螺旋辊;移动机构包括横向移动组与竖向移动组,竖向移动组的中部活动设置连接块,连接块的顶部设置有凹槽,凹槽的中部固定设置有铺设件。本发明中,整体设备入水后,位于铺设板前端所设有两组螺旋辊,底板处与海底地面接触后,可通过第一电机驱动螺旋辊完成转动,螺旋辊钻入海底内部之后,进而保障整体的稳定性,且完成了后期的快速入海的效果,提高后期线缆铺设的效率。
Submarine cable laying device for ocean engineering construction
一种海洋工程施工用海底线缆铺设装置
XIONG PEIPEI (author)
2022-05-10
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Engineering Index Backfile | 1898
|Submarine cable laying construction isolation device with protection function
European Patent Office | 2023
|