A platform for research: civil engineering, architecture and urbanism
Prefabricated part of fabricated building and manufacturing method of prefabricated part
The invention discloses a prefabricated part of a fabricated building. The prefabricated part comprises a plurality of non-dismantling formworks, a steel bar positioning frame and a plurality of column steel bars, the steel bar positioning frame and the non-dismantling formworks form a column cage formwork, and the steel bar positioning frame and the non-dismantling formworks form a beam cage formwork; the prefabricated part further comprises a positioning and connecting assembly for positioning the beam cage mold on the column cage mold. Concrete is poured into the column cage mold and the beam cage mold, and the column cage mold and the beam cage mold which are internally poured with the concrete form a building structure. The periphery of the beam column prefabricated part is built through the non-dismantling formwork, the non-dismantling formwork does not need to be dismantled after building is completed, and concrete raw materials are saved; a plurality of reinforcing steel bars are arranged in the non-dismantling formwork in a criss-cross mode through the reinforcing steel bar positioning frame, the beam cage formwork can have a plurality of positioning positions on the column cage formwork through the positioning connecting assembly, and the non-dismantling formwork is suitable for various building concrete beam column sizes and wide in application range.
本发明公开了一种装配式建筑的预制构件,包括若干个免拆模板、钢筋定位架,若干柱钢筋、所述钢筋定位架、若干块所述免拆模板形成一柱笼模,若干梁钢筋、所述钢筋定位架、若干块所述免拆模板形成一梁笼模;所述预制构件还包括将所述梁笼模定位在所述柱笼模上的定位连接组件;所述柱笼模和梁笼模的内部灌注有混凝土,内部灌注混凝土的所述柱笼模和梁笼模形成建筑结构。本发明梁柱预制件的外周通过免拆模板进行建立,建设完成后无需拆除免拆模板,节约混凝土原材料;免拆模板内部通过钢筋定位架纵横交错设置有若干根钢筋,通过定位连接组件梁笼模在柱笼模上可以有若干个定位位置,适用多种建筑混凝土梁柱尺寸,应用范围广。
Prefabricated part of fabricated building and manufacturing method of prefabricated part
The invention discloses a prefabricated part of a fabricated building. The prefabricated part comprises a plurality of non-dismantling formworks, a steel bar positioning frame and a plurality of column steel bars, the steel bar positioning frame and the non-dismantling formworks form a column cage formwork, and the steel bar positioning frame and the non-dismantling formworks form a beam cage formwork; the prefabricated part further comprises a positioning and connecting assembly for positioning the beam cage mold on the column cage mold. Concrete is poured into the column cage mold and the beam cage mold, and the column cage mold and the beam cage mold which are internally poured with the concrete form a building structure. The periphery of the beam column prefabricated part is built through the non-dismantling formwork, the non-dismantling formwork does not need to be dismantled after building is completed, and concrete raw materials are saved; a plurality of reinforcing steel bars are arranged in the non-dismantling formwork in a criss-cross mode through the reinforcing steel bar positioning frame, the beam cage formwork can have a plurality of positioning positions on the column cage formwork through the positioning connecting assembly, and the non-dismantling formwork is suitable for various building concrete beam column sizes and wide in application range.
本发明公开了一种装配式建筑的预制构件,包括若干个免拆模板、钢筋定位架,若干柱钢筋、所述钢筋定位架、若干块所述免拆模板形成一柱笼模,若干梁钢筋、所述钢筋定位架、若干块所述免拆模板形成一梁笼模;所述预制构件还包括将所述梁笼模定位在所述柱笼模上的定位连接组件;所述柱笼模和梁笼模的内部灌注有混凝土,内部灌注混凝土的所述柱笼模和梁笼模形成建筑结构。本发明梁柱预制件的外周通过免拆模板进行建立,建设完成后无需拆除免拆模板,节约混凝土原材料;免拆模板内部通过钢筋定位架纵横交错设置有若干根钢筋,通过定位连接组件梁笼模在柱笼模上可以有若干个定位位置,适用多种建筑混凝土梁柱尺寸,应用范围广。
Prefabricated part of fabricated building and manufacturing method of prefabricated part
一种装配式建筑的预制构件及其制作方法
TANG DAN (author) / GUI XIAOJUN (author) / LUO ZEPING (author) / TAO YANHUA (author) / TANG ZHONGQIANG (author)
2022-05-10
Patent
Electronic Resource
Chinese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
Prefabricated part of fabricated building and assembling method of prefabricated part
European Patent Office | 2024
|Fabricated building prefabricated part assembling equipment
European Patent Office | 2020
|