Drilling, crushing and rolling construction method for cement pavement
The invention relates to the technical field of construction for rebuilding a cement pavement into an asphalt pavement, in particular to a cement pavement drilling, crushing and rolling construction method which comprises the following steps: measuring and setting out a broken part of a cement pavement, and determining the range of the broken part; determining disease crack types of different breaking positions in the breaking part; drilling position positioning is carried out on different breaking positions; drilling and breaking are conducted on different breaking positions, and then pressure stabilizing construction is conducted; and carrying out base layer detection on the broken position after the voltage stabilization construction. When the method is adopted to overhaul and reconstruct the cement pavement, the broken stones formed after the cement pavement is crushed are used as the cushion layer, the broken stones do not need to be cleaned, a large amount of waste materials are not generated, the pollution to the environment is reduced, the crushed cement pavement is used as the cushion layer to be reused, and the work amount and the cost of subsequent reconstruction of the cement pavement are reduced.
本申请涉及水泥路面改建沥青路面施工技术领域,尤其涉及一种水泥路面钻孔破碎碾压施工方法,该方法包括:对水泥路面的破除部位进行测量放样,确定破除部位的范围;确定破除部位中不同的破除位置的病害裂缝类型;对不同的破除位置进行钻孔位置定位;对不同的破除位置进行钻孔破碎后再进行稳压施工;对进行稳压施工后的破除位置进行基层检测。采用该方法对水泥路面进行大修改造时,将水泥路面破碎后形成的碎石作为垫层,不需要清理碎石,无大量的废料产生,减少了对环境的污染,并且将水泥路面破碎后作为垫层再次利用,减少了对水泥路面后续改造的工程量和费用。
Drilling, crushing and rolling construction method for cement pavement
The invention relates to the technical field of construction for rebuilding a cement pavement into an asphalt pavement, in particular to a cement pavement drilling, crushing and rolling construction method which comprises the following steps: measuring and setting out a broken part of a cement pavement, and determining the range of the broken part; determining disease crack types of different breaking positions in the breaking part; drilling position positioning is carried out on different breaking positions; drilling and breaking are conducted on different breaking positions, and then pressure stabilizing construction is conducted; and carrying out base layer detection on the broken position after the voltage stabilization construction. When the method is adopted to overhaul and reconstruct the cement pavement, the broken stones formed after the cement pavement is crushed are used as the cushion layer, the broken stones do not need to be cleaned, a large amount of waste materials are not generated, the pollution to the environment is reduced, the crushed cement pavement is used as the cushion layer to be reused, and the work amount and the cost of subsequent reconstruction of the cement pavement are reduced.
本申请涉及水泥路面改建沥青路面施工技术领域,尤其涉及一种水泥路面钻孔破碎碾压施工方法,该方法包括:对水泥路面的破除部位进行测量放样,确定破除部位的范围;确定破除部位中不同的破除位置的病害裂缝类型;对不同的破除位置进行钻孔位置定位;对不同的破除位置进行钻孔破碎后再进行稳压施工;对进行稳压施工后的破除位置进行基层检测。采用该方法对水泥路面进行大修改造时,将水泥路面破碎后形成的碎石作为垫层,不需要清理碎石,无大量的废料产生,减少了对环境的污染,并且将水泥路面破碎后作为垫层再次利用,减少了对水泥路面后续改造的工程量和费用。
Drilling, crushing and rolling construction method for cement pavement
水泥路面钻孔破碎碾压施工方法
LI XI (author) / CHENG XINGWANG (author) / ZHAO DUO (author) / SUN JIZHANG (author) / WANG YANJUN (author) / JIANG BO (author) / ZHAO CHENKAI (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Cement pavement crushing plate assembly type treatment structure and construction method
European Patent Office | 2020
|Cement pavement crushing and regenerating machine and method
European Patent Office | 2024
|Cement pavement crushing and regenerating machine and control method
European Patent Office | 2023
|