A platform for research: civil engineering, architecture and urbanism
Check gate with high-pressure silt flushing function
The check gate with the high-pressure silt flushing function comprises a mounting plate and a baffle which are arranged at the bottom of a gate body, a gate body is arranged on the mounting plate, and a high-pressure silt flushing mechanism is arranged in the gate body; the high-pressure silt flushing mechanism comprises two symmetrically-arranged first steel pipes pre-buried in the baffle, the side wall of each first steel pipe is fixedly connected with a plurality of water outlet pipes arranged in an array mode, and the other ends of the water outlet pipes penetrate through the side wall of the baffle and are fixedly connected with high-pressure anti-blocking nozzles. And two symmetrically arranged pump bodies are fixedly connected to the two sides of the gate body. According to the check gate with the high-pressure silt flushing function, water flow can be pumped through the pump body to conduct high-pressure silt flushing on silt at the bottom of the gate body, the desilting efficiency and effect are guaranteed, meanwhile, the pumped water flow can be filtered, foreign matter on the surface of the filter screen can be automatically cleaned, blockage of the filter screen can be avoided, and the high-pressure silt flushing effect is guaranteed.
本发明公开了一种具有高压冲淤功能的节制闸,包括设置在闸体底部的安装板和挡板,且安装板上设置有闸门,所述闸体内设置有高压冲淤机构;所述高压冲淤机构包括预埋在挡板内两个对称设置的第一钢管,且各个第一钢管的侧壁固定连接有多个阵列设置的出水管,所述出水管的另一端贯穿挡板的侧壁并固定连接有高压防堵喷嘴,且闸体的两侧固定连接有两个对称设置的泵体。该种具有高压冲淤功能的节制闸,能够通过泵体抽取水流对闸体底部的淤泥进行高压冲淤,保证清淤效率和效果,同时,能够对抽取的水流进行过滤,并且,能够对过滤网表面异物的自动清理,避免其堵塞,保证高压冲淤效果。
Check gate with high-pressure silt flushing function
The check gate with the high-pressure silt flushing function comprises a mounting plate and a baffle which are arranged at the bottom of a gate body, a gate body is arranged on the mounting plate, and a high-pressure silt flushing mechanism is arranged in the gate body; the high-pressure silt flushing mechanism comprises two symmetrically-arranged first steel pipes pre-buried in the baffle, the side wall of each first steel pipe is fixedly connected with a plurality of water outlet pipes arranged in an array mode, and the other ends of the water outlet pipes penetrate through the side wall of the baffle and are fixedly connected with high-pressure anti-blocking nozzles. And two symmetrically arranged pump bodies are fixedly connected to the two sides of the gate body. According to the check gate with the high-pressure silt flushing function, water flow can be pumped through the pump body to conduct high-pressure silt flushing on silt at the bottom of the gate body, the desilting efficiency and effect are guaranteed, meanwhile, the pumped water flow can be filtered, foreign matter on the surface of the filter screen can be automatically cleaned, blockage of the filter screen can be avoided, and the high-pressure silt flushing effect is guaranteed.
本发明公开了一种具有高压冲淤功能的节制闸,包括设置在闸体底部的安装板和挡板,且安装板上设置有闸门,所述闸体内设置有高压冲淤机构;所述高压冲淤机构包括预埋在挡板内两个对称设置的第一钢管,且各个第一钢管的侧壁固定连接有多个阵列设置的出水管,所述出水管的另一端贯穿挡板的侧壁并固定连接有高压防堵喷嘴,且闸体的两侧固定连接有两个对称设置的泵体。该种具有高压冲淤功能的节制闸,能够通过泵体抽取水流对闸体底部的淤泥进行高压冲淤,保证清淤效率和效果,同时,能够对抽取的水流进行过滤,并且,能够对过滤网表面异物的自动清理,避免其堵塞,保证高压冲淤效果。
Check gate with high-pressure silt flushing function
一种具有高压冲淤功能的节制闸
WU YI (author) / MENG YIKAI (author) / YUAN YAN (author) / YU KUI (author) / MA YUZHOU (author) / XU CHENGKAI (author) / TAN HONGYANG (author)
2022-05-13
Patent
Electronic Resource
Chinese
Water gate flow guiding and silt flushing structure and method
European Patent Office | 2023
|Lever type automatic silt flushing device for silt plugging section of drainage ditch
European Patent Office | 2023
|