The invention relates to a pipe gallery side wall pre-buried channel adjustable back shore fixing system and a construction method thereof.The pipe gallery side wall pre-buried channel adjustable back shore fixing system comprises a pre-buried channel with a notch in one face and formworks arranged on the two sides of the pre-buried channel, a supporting part is arranged on the side, away from the notch, of the pre-buried channel, and a distance adjusting device used for adjusting the distance is arranged between the supporting part and the pre-buried channel; and a mounting device for fixing the supporting part between the two templates is arranged on the supporting part. When a constructor installs the pipe gallery formwork, the formwork on one side of the pipe gallery is installed firstly, the supporting part abuts against the inner wall of the built formwork, then the formwork on the other side of the pipe gallery is installed, the supporting part and the side, provided with a notch, of the pre-buried channel abut against the inner walls of the two formworks correspondingly, then concrete is poured into the formworks, and pipe gallery side wall pouring is completed. Therefore, the operation of forming holes in the formwork is avoided, and the effect of prolonging the service life of the formwork is achieved.
本申请涉及一种管廊侧墙预埋槽道可调节顶撑固定体系及其施工方法,其包括一面带有槽口的预埋槽道和设置在预埋槽道两侧的模板,预埋槽道背离槽口一侧设置支撑部,支撑部与预埋槽道间设置有用于调节间距的距离调节装置,支撑部上设置有用于将支撑部固定在两块模板之间的安装装置。在施工人员安装管廊模板时,先安装管廊一侧模板,使支撑部抵接在已搭建的模板的内壁,再安装管廊的另一侧模板,使支撑部和预埋槽道带有槽口的一侧分别与两块模板的内壁抵接,然后向模板内浇灌混凝土,完成管廊侧墙浇筑,从而避免了在模板上开孔的操作,本申请具有延长模板使用寿命的效果。
The invention relates to a pipe gallery side wall pre-buried channel adjustable back shore fixing system and a construction method thereof.The pipe gallery side wall pre-buried channel adjustable back shore fixing system comprises a pre-buried channel with a notch in one face and formworks arranged on the two sides of the pre-buried channel, a supporting part is arranged on the side, away from the notch, of the pre-buried channel, and a distance adjusting device used for adjusting the distance is arranged between the supporting part and the pre-buried channel; and a mounting device for fixing the supporting part between the two templates is arranged on the supporting part. When a constructor installs the pipe gallery formwork, the formwork on one side of the pipe gallery is installed firstly, the supporting part abuts against the inner wall of the built formwork, then the formwork on the other side of the pipe gallery is installed, the supporting part and the side, provided with a notch, of the pre-buried channel abut against the inner walls of the two formworks correspondingly, then concrete is poured into the formworks, and pipe gallery side wall pouring is completed. Therefore, the operation of forming holes in the formwork is avoided, and the effect of prolonging the service life of the formwork is achieved.
本申请涉及一种管廊侧墙预埋槽道可调节顶撑固定体系及其施工方法,其包括一面带有槽口的预埋槽道和设置在预埋槽道两侧的模板,预埋槽道背离槽口一侧设置支撑部,支撑部与预埋槽道间设置有用于调节间距的距离调节装置,支撑部上设置有用于将支撑部固定在两块模板之间的安装装置。在施工人员安装管廊模板时,先安装管廊一侧模板,使支撑部抵接在已搭建的模板的内壁,再安装管廊的另一侧模板,使支撑部和预埋槽道带有槽口的一侧分别与两块模板的内壁抵接,然后向模板内浇灌混凝土,完成管廊侧墙浇筑,从而避免了在模板上开孔的操作,本申请具有延长模板使用寿命的效果。
Adjustable back shore fixing system for pre-buried channel of pipe gallery side wall and construction method of adjustable back shore fixing system
一种管廊侧墙预埋槽道可调节顶撑固定体系及其施工方法
CAI HUA (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pit support back shore device for pipe gallery construction
European Patent Office | 2020
|Device for fixing back-attached water-stop belt of pipe gallery and construction method
European Patent Office | 2020
|Fixing device used for concrete pipe gallery side wall embedded parts
European Patent Office | 2020
|