A platform for research: civil engineering, architecture and urbanism
Positioning scaffold for wall attachment in constructional engineering
The positioning construction frame comprises a vertical rail frame, a lifting table is vertically installed on the vertical rail frame in a lifting mode, a mounting vertical plate is vertically and fixedly connected to one side of the lifting table, a slag shoveling mechanism is arranged at the top of the mounting vertical plate, a mortar feeding mechanism is arranged in the middle of the mounting vertical plate, and a mortar discharging mechanism is arranged in the middle of the mounting vertical plate. A tiling hole for tiling is formed in the bottom of the mounting vertical plate; and the mortar feeding mechanism comprises a material rotating box, a transverse hole is formed in a plate body of the mounting vertical plate, the material rotating box fixedly penetrates through the interior of the transverse hole, and a plurality of rotating mounting grooves which communicate with one another and are formed side by side are formed in the material rotating box. Manpower is greatly saved, the working environment of building workers is improved, uniform laying of mortar is guaranteed, the laying thickness of the mortar can be adjusted, applicability and versatility are high, design is ingenious, the structure is stable, using is convenient and fast, and the using requirements of people in production and life are met.
本发明公开了一种建筑工程墙体贴附用定位施工架,包括竖直轨道架,所述竖直轨道架上竖直升降安装有升降台,所述升降台的一侧竖直固定连接有安装立板,所述安装立板的顶部设置有铲渣机构,安装立板的中部设置有砂浆供料机构,所述安装立板的底部开设有供贴砖用的贴砖孔;所述砂浆供料机构包括转料箱,所述安装立板的板体开设有横孔,且转料箱与横孔内固定穿过,所述转料箱内开设有若干个相互连通的、并排设置的转动安装槽。本发明极大的节省了人力,提升了建筑工人的工作环境,保证了砂浆的均匀铺设,且砂浆的铺设厚度能够调节,适用性、多用性强,设计巧妙,结构稳定,使用便捷,满足了人们在生产生活中的使用需求。
Positioning scaffold for wall attachment in constructional engineering
The positioning construction frame comprises a vertical rail frame, a lifting table is vertically installed on the vertical rail frame in a lifting mode, a mounting vertical plate is vertically and fixedly connected to one side of the lifting table, a slag shoveling mechanism is arranged at the top of the mounting vertical plate, a mortar feeding mechanism is arranged in the middle of the mounting vertical plate, and a mortar discharging mechanism is arranged in the middle of the mounting vertical plate. A tiling hole for tiling is formed in the bottom of the mounting vertical plate; and the mortar feeding mechanism comprises a material rotating box, a transverse hole is formed in a plate body of the mounting vertical plate, the material rotating box fixedly penetrates through the interior of the transverse hole, and a plurality of rotating mounting grooves which communicate with one another and are formed side by side are formed in the material rotating box. Manpower is greatly saved, the working environment of building workers is improved, uniform laying of mortar is guaranteed, the laying thickness of the mortar can be adjusted, applicability and versatility are high, design is ingenious, the structure is stable, using is convenient and fast, and the using requirements of people in production and life are met.
本发明公开了一种建筑工程墙体贴附用定位施工架,包括竖直轨道架,所述竖直轨道架上竖直升降安装有升降台,所述升降台的一侧竖直固定连接有安装立板,所述安装立板的顶部设置有铲渣机构,安装立板的中部设置有砂浆供料机构,所述安装立板的底部开设有供贴砖用的贴砖孔;所述砂浆供料机构包括转料箱,所述安装立板的板体开设有横孔,且转料箱与横孔内固定穿过,所述转料箱内开设有若干个相互连通的、并排设置的转动安装槽。本发明极大的节省了人力,提升了建筑工人的工作环境,保证了砂浆的均匀铺设,且砂浆的铺设厚度能够调节,适用性、多用性强,设计巧妙,结构稳定,使用便捷,满足了人们在生产生活中的使用需求。
Positioning scaffold for wall attachment in constructional engineering
一种建筑工程墙体贴附用定位施工架
ZHANG ZHONGYAN (author) / MA YANHONG (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Positioning scaffold for wall attachment in constructional engineering
European Patent Office | 2022
|