Installation and construction method for German tower with high formwork supporting frame
The invention discloses an installation and construction method for a German tower with a high formwork supporting frame. The installation and construction method comprises the steps that S1, a positioning base is installed; s2, tower frames are spliced layer by layer till tower frame splicing is completed; s3, the positioning base and the tower frame are connected into a German tower of an integral structure through a locking piece; s4, after the current construction part is used, whether the height of the German tower needs to be adjusted or not is judged; if the height of the German tower needs to be adjusted, executing the step S5; if the height of the German tower does not need to be adjusted, directly executing the step S6; s5, the current German tower is transferred to the open ground through hoisting equipment, and the height of the German tower is increased or decreased according to the height of the high formwork of the next construction part; and S6, the German tower is transferred to the next construction position through hoisting equipment. A large amount of repeated mounting and dismounting work can be omitted, the turnover efficiency is high, the implementation form is clear and simple, practical engineering application is facilitated, and high-formwork supporting frame German tower mounting construction can be more economical and efficient.
本发明公开了一种高支模支撑架德国塔安装施工方法,包括:步骤S1,安装定位基座;步骤S2,逐层拼接塔架,直至塔架拼接完成;步骤S3,用锁定件将所述定位基座与所述塔架连为一个整体结构的德国塔;步骤S4,当前施工部位使用完成后,判断是否需要调整德国塔的高度;若需调整德国塔的高度,则执行步骤S5;若不需调整德国塔的高度,直接执行步骤S6;步骤S5,利用起重设备将当前的德国塔转移至开阔地,根据下一施工部位的高支模高度,增加或减少德国塔的高度;步骤S6,利用起重设备将德国塔转移至下一施工部位。可免去大量的重复安装、拆除工作,周转效率高,实现形式清晰简洁,便于实际工程应用,可以使得高支模支撑架德国塔安装施工更为经济高效。
Installation and construction method for German tower with high formwork supporting frame
The invention discloses an installation and construction method for a German tower with a high formwork supporting frame. The installation and construction method comprises the steps that S1, a positioning base is installed; s2, tower frames are spliced layer by layer till tower frame splicing is completed; s3, the positioning base and the tower frame are connected into a German tower of an integral structure through a locking piece; s4, after the current construction part is used, whether the height of the German tower needs to be adjusted or not is judged; if the height of the German tower needs to be adjusted, executing the step S5; if the height of the German tower does not need to be adjusted, directly executing the step S6; s5, the current German tower is transferred to the open ground through hoisting equipment, and the height of the German tower is increased or decreased according to the height of the high formwork of the next construction part; and S6, the German tower is transferred to the next construction position through hoisting equipment. A large amount of repeated mounting and dismounting work can be omitted, the turnover efficiency is high, the implementation form is clear and simple, practical engineering application is facilitated, and high-formwork supporting frame German tower mounting construction can be more economical and efficient.
本发明公开了一种高支模支撑架德国塔安装施工方法,包括:步骤S1,安装定位基座;步骤S2,逐层拼接塔架,直至塔架拼接完成;步骤S3,用锁定件将所述定位基座与所述塔架连为一个整体结构的德国塔;步骤S4,当前施工部位使用完成后,判断是否需要调整德国塔的高度;若需调整德国塔的高度,则执行步骤S5;若不需调整德国塔的高度,直接执行步骤S6;步骤S5,利用起重设备将当前的德国塔转移至开阔地,根据下一施工部位的高支模高度,增加或减少德国塔的高度;步骤S6,利用起重设备将德国塔转移至下一施工部位。可免去大量的重复安装、拆除工作,周转效率高,实现形式清晰简洁,便于实际工程应用,可以使得高支模支撑架德国塔安装施工更为经济高效。
Installation and construction method for German tower with high formwork supporting frame
一种高支模支撑架德国塔安装施工方法
TANG LIANG (author) / BAI YUJING (author) / LI JIANHUA (author) / ZHANG LELE (author) / LIN SHIHUI (author) / GAO QUANLONG (author) / JI LAIYOU (author) / TANG MINGCHENG (author) / ZHANG SIWEI (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2023
|Haunching formwork, formwork frame and construction method of formwork frame
European Patent Office | 2023
|Polygonal concrete frame column formwork supporting construction method
European Patent Office | 2021
|