A platform for research: civil engineering, architecture and urbanism
Embedded steel column verticality adjusting system and construction method thereof
The invention belongs to the technical field of building pile foundation construction, and particularly relates to an embedded steel column verticality adjusting system and a construction method thereof, the verticality adjusting system needs less manual operation in the verticality adjusting process, and the construction steps are simple. The perpendicularity adjusting system comprises a perpendicularity adjusting support arranged above a pile hole and a guide structure connected with the top of an embedded steel column and coaxial with the perpendicularity adjusting support, the guide structure and the embedded steel column penetrate through the middle of the perpendicularity adjusting support, and a center positioning device and an angle adjusting device are installed at different height positions of the perpendicularity adjusting support from bottom to top respectively. The center of the center positioning device is provided with a limiting opening used for limiting the side face of the guiding structure, and the side face of the guiding structure is provided with an erecting foot used for being erected on the center positioning device. The angle adjusting device is arranged on the periphery of the guide structure and clamps and fixes the guide structure inside. In the perpendicularity adjusting process of the perpendicularity adjusting system, a constructor only needs to manually operate the center positioning device and the angle adjusting device, other structures do not need to be manually operated, manual operation is little, and construction steps are simple.
本发明属于建筑桩基施工技术领域,具体涉及一种预埋钢柱调垂系统及其施工方法,该调垂系统在调垂过程需要较少的人工操作,施工步骤简单。该调垂系统包含设置在桩孔上方的调垂支架及与预埋钢柱顶部连接并与其同轴的导向结构,导向结构与预埋钢柱穿过调垂支架中部,调垂支架不同高度位置自下而上分别安装有中心定位装置与角度调节装置,中心定位装置的中心设有用于对导向结构的侧面进行限位的限位口,导向结构侧面设有用于架设在中心定位装置上的架设脚;角度调节装置设置在导向结构四周将其夹持固定在内。在该调垂系统的调垂过程中,施工人员仅需手动中心定位装置与角度调节装置即可,无需手动操作其他结构,人工手动操作少,施工步骤简单。
Embedded steel column verticality adjusting system and construction method thereof
The invention belongs to the technical field of building pile foundation construction, and particularly relates to an embedded steel column verticality adjusting system and a construction method thereof, the verticality adjusting system needs less manual operation in the verticality adjusting process, and the construction steps are simple. The perpendicularity adjusting system comprises a perpendicularity adjusting support arranged above a pile hole and a guide structure connected with the top of an embedded steel column and coaxial with the perpendicularity adjusting support, the guide structure and the embedded steel column penetrate through the middle of the perpendicularity adjusting support, and a center positioning device and an angle adjusting device are installed at different height positions of the perpendicularity adjusting support from bottom to top respectively. The center of the center positioning device is provided with a limiting opening used for limiting the side face of the guiding structure, and the side face of the guiding structure is provided with an erecting foot used for being erected on the center positioning device. The angle adjusting device is arranged on the periphery of the guide structure and clamps and fixes the guide structure inside. In the perpendicularity adjusting process of the perpendicularity adjusting system, a constructor only needs to manually operate the center positioning device and the angle adjusting device, other structures do not need to be manually operated, manual operation is little, and construction steps are simple.
本发明属于建筑桩基施工技术领域,具体涉及一种预埋钢柱调垂系统及其施工方法,该调垂系统在调垂过程需要较少的人工操作,施工步骤简单。该调垂系统包含设置在桩孔上方的调垂支架及与预埋钢柱顶部连接并与其同轴的导向结构,导向结构与预埋钢柱穿过调垂支架中部,调垂支架不同高度位置自下而上分别安装有中心定位装置与角度调节装置,中心定位装置的中心设有用于对导向结构的侧面进行限位的限位口,导向结构侧面设有用于架设在中心定位装置上的架设脚;角度调节装置设置在导向结构四周将其夹持固定在内。在该调垂系统的调垂过程中,施工人员仅需手动中心定位装置与角度调节装置即可,无需手动操作其他结构,人工手动操作少,施工步骤简单。
Embedded steel column verticality adjusting system and construction method thereof
一种预埋钢柱调垂系统及其施工方法
ZHOU PENGYANG (author) / CAI JIANLIANG (author) / XU XIULIN (author) / SUN YONG (author) / LIU YUEQIANG (author) / WANG XU (author)
2022-05-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Positioning verticality adjusting device and steel pipe column positioning construction method
European Patent Office | 2024
|Ultra-deep reverse construction method steel column positioning and verticality adjusting method
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2015
|European Patent Office | 2023
|